Download presentation
Presentation is loading. Please wait.
1
CEESA 2nd consortium meeting
28-29 August 2007 at Gl. Vrå Slot Welcome Henrik Lund
2
Welcome Participants presentation Practical details
Status on contract and paper works Invitation to 1. SMV-project, 2. Regionerne and 3. PhD-project Short introduction to the project Main objectives of this meeting
4
Organisation Leader, WP leaders and administrative project manager: Collection and compilation of all project deliverables. Management board (one representative for each partner+leader+APM): Monitoring and supervision, progress reports and all legal aspects. Consortium: all (annual meetings) International Advisory Panel: Participate in three consortium meetings.
6
Meetings ”Start-up” meeting in January 2007
1. Consortium-meeting: Presentation of state-of-the-art scenarios. Including IAP (Internationale Advisory Panel): August 2007 2. Consortium-meeting summer 2008 without IAP (with?) 3. Consortium-meeting summer 2009 with IAP 4. Consoritum-meeting summer 2010 with/without IAP ? Closing seminar, ultimo 2010: Dissemination (IAP?)
7
Main Objectives first half year
Identify relevant 100% RES scenarios to present for discussion at the first consortium meeting: Energy System Analyses Life Cycle Assessment (LCA) Find and employ 4/5 PhDs Define International Advisory Panel
8
Main Objectives of this meeting
Status on the work in each WP Discuss scenario-framework for the project including the role of each WP in the work to come Decide on time and content of next consortium meeting
9
Agenda Tomorrow: Today: Welcome Breakfast WP1 (and WP5) WP4 (Market)
Lunch WP2 (Transport and Biomass) Coffee WP3 (Electric Power) Dinner Tomorrow: Breakfast WP4 (Market) IAP comments Lunch Discussions Goodbye
10
Minutes WP-leader/chairman prepare short minutes from each session
Mette prepare minuttes from discussion and welcome Remember
11
Energy System Analysis of three 100% RES scenarios
CEESA 2nd consortium meeting 28-29 August 2007 at Gl. Vrå Slot Energy System Analysis of three 100% RES scenarios Henrik Lund
12
100% RES Scenarios
13
Based on IDA Energy PLAN
14
Discussion in WP group Demand (from the CEESA January meeting) ?
How many scenarios? WP1 suggest: 3 scenarios: Biomass Wind High Demand
16
How to understamd the scenarios
Framework (to be adjusted during the coming 3-4 years) The scenarios is not optimised yet LCA should be incorporated (WP1 – WP5) External markets (WP4) Transport alternatives (WP2) Electricity System (WP3)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.