Presentation is loading. Please wait.

Presentation is loading. Please wait.

Welcome to the 2016 USNORTHCOM SAR and PR Workshop

Similar presentations


Presentation on theme: "Welcome to the 2016 USNORTHCOM SAR and PR Workshop"— Presentation transcript:

1 Welcome to the 2016 USNORTHCOM SAR and PR Workshop

2 Why We’re Here Strengthen PARTNERSHIPS Share KNOWLEDGE
Address the CHALLENGES Develop Roadmaps for SOLUTIONS

3 Agenda 2 May 2 May 0800-0830 Arrival and In-Processing at Leidos
Opening Remarks by RDML Mike McAllister, NORTHCOM J3D Welcome, Admin, & Agenda Review (LT Fishman, N-NC J7 and Lt Col Smith, NC/J35) Break Current NORTHCOM SAR Initiatives (Mr. Sokol, NC/J35) ARNORTH SAR Initiatives (LTC Hahn, ARNORTH PRCC Director) AFNORTH SAR will be briefed with AFRCC and JTF-SAR Presentations; ALCOM SAR will be briefed in conjunction with AKRCC Presentations National Guard Bureau SAR Initiatives (Lt Col Wenthe, NGB/A3) Lunch NORTHCOM CSZ Playbook Overview (Mr. Haynes, N-NC/J55) ARDENT SENTRY 16 Introduction (LT Fishman, N-NC/J7) JTF-SAR and guided ARDENT SENTRY 16 discussion (Mr. Fennell, AFNORTH A3) 1800 No-Host Social at Nano 108 Brewery 2402 Waynoka Rd, Colorado Springs, CO 80915

4 Agenda 3 May 3 May AKRCC, Arctic SAR/Exercises (Mr. VanderWeide, ALCOM J7 and/or Lt Col Milani, AKRCC Director) AFRCC Operations and SAR TSC w/MEX (Maj Gardner, AFRCC/DO) Break NGA Support to SAR (Maj Couchman, NGA) U.S. Coast Guard Capabilities and RCC Operations (USCG, LCDR Johnson, CG D11) MARFORNORTH SAR Initiatives (LtCol Belknap, MARFORNORTH J35) FEMA Brief (Mike Boyle, FEMA) Lunch FFT Operational Applications (Mike Hicks, N-NC SAGE Rep) SAR Courseware & Future Training/Tech Opportunities (Open Forum led by Mr. Sokol, NC/J35) Open Discussion Time/Group Feedback (Lt Col Smith, NC/J35)

5 Agenda 4 May 4 May Admin, Registration, Agenda Review (for those that did not attend the SAR portion of the Workshop) Review of Current National-Level and DoD PR Guidance (Mr. Ragaller, JPRA LNO to USNORTHCOM) Break JPRCaP and DSPRCE (Mr. Ragaller, JPRA LNO to NC) JPRIDE (Lt Col Wenthe, NGB/A3) ARNORTH and Phase II Reintegration/PISA (LTC Hahn, ARNORTH PRCC Director) Lunch Future Training/Tech Opportunities (Open Forum Discussion, led by Mr. Sokol, NC/J35) RSO/State Department (SSA Barry Hale, DoS PR Program Manager) Open Discussion Time/Group Feedback (Lt Col Smith, NC/J35)

6 5 May – Classified Briefing Day
Agenda 5 May 5 May – Classified Briefing Day Clearance roster verification (LT Fishman/Maj Alickson) NGA Briefing (Maj Couchman, NGA) SECRET Briefing NRO Capabilities (Ms. Phyllis Cooper, NRO) Break SOCNORTH and PR in Mexico (CW3 Quinones, SOCNORTH) NORTHCOM PR Products Review (CONPLANS, OPORDS, SPINS, Country Clearance) – (Maj Rusch, NC/JPRC) SECRET Briefing Lunch Time to re-verify security roster for afternoon (LT Fishman/Maj Alickson) NORAD PR Mission Analysis Briefing (Lt Col Smith, NC J35) NORAD PR Breakout Session (Lt Col Smith, NC/J35 with NORAD J33 Rep) JMET/DRRS Initiative / Breakout (Lt Col Smith, NC/J35 w/JPRC, AFRCC, AKRCC, and Component POCs) Final Inputs, Discussion, and Feedback

7 Sign-in each day Keep badge over lunch Remember badge # Return badge at end of day Parking Do not park in reserved slots Exit Code 4357 Facilities, emergencies and food…

8 Food & Beverages Allowed in Classroom Free coffee, tea, hot chocolate Please clean-up your area at end of day Mini refrigerators in Mt. Elbert break area

9 Coffee/Vending Machines
Mt. Elbert Room (You Are Here!) Leidos North Entrance Leidos South Entrance Reception Desk Restrooms Hallway Coffee/Vending Machines Break Room Phone “Booths” Coffee

10 Assembly & Smoking Areas
IN CASE OF EMERGENCY Emergency Telephone Fire Medical 911 Evacuation Signal : Audible Alarm and Strobe Activate a manual fire alarm pull station Call 911 and report the fire Attempt to control fire only if safe to do so Evacuate the area and report to your supervisor in the assembly area For more information contact the facility manager at or (after hours) Call 911 Do not move the victim (except for safety reasons) Report incident to the Receptionist ( ) Leidos Building Assembly Area N Smoking Area Mt Elbert

11 Local Restaurants BBQ Sandy’s Cash only DQ Tacos Thai

12

13 PAFB North Gate Leidos DV Parking Leidos Main Entrance

14 Nano 108 Brewery


Download ppt "Welcome to the 2016 USNORTHCOM SAR and PR Workshop"

Similar presentations


Ads by Google