Presentation is loading. Please wait.

Presentation is loading. Please wait.

Director, Transmission Services

Similar presentations


Presentation on theme: "Director, Transmission Services"— Presentation transcript:

1 Director, Transmission Services
Report on Electric System Constraints and Needs: Executive Summary October 18, 2005 Bill Bojorquez Director, Transmission Services

2 Summary Annual status report filed with PUCT System Operations
Load (Peak Demand and Energy Forecast) Generation (Existing and Planned) Congestion Costs Improvement Costs Area Constraints and Improvements Completed improvements Planned improvements Projected constraints

3

4

5

6

7

8 345-kV Completed Improvements 1999-2005
Summary of Completed Improvements Over $2.2 billion 345 kV 1,600 circuit miles 138 kV 2,500 circuit miles 20,400 Transformer MVA Numerous Reactive Additions

9 345-kV Planned Improvements 2006-2012+
Summary of Planned Improvements Over $3.1 billion 345 kV 1,400 circuit miles 138 kV 2,000 circuit miles 21,700 Transformer MVA Numerous Reactive Additions

10 Conclusions ERCOT Region continues to lead planning and construction of system improvements Capital and operational improvements provide significant reduction in congestion costs Additional studies underway Pre-Nodal Transmission Study Senate Bill 20 Biennial Report on Transmission and Generation Needs (including support for determination of renewable energy zones)


Download ppt "Director, Transmission Services"

Similar presentations


Ads by Google