1 EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Welcome to students back to the FTC.

2 EWR DCL Flight Tests 6 Flights conducted 16 May – 6 Jun 13
MD-11, Flight 1083, EWR-SDF, 0220z dept (2220L) Telecon during ground ops EWR Tower UPS Ops FAA Data Comm Team Flight Crew

3 Flight 1, 16 May Ground Ops Logon successful

4 Flight 1, 16 May Ground Ops Logon successful Initial Clearance, CAF

5 Flight 1, 16 May Ground Ops Logon successful Initial Clearance, CAF
During Taxi, Revised Dept Freq

6 Flight 1, 16 May Ground Ops Logon successful Initial Clearance, CAF
During Taxi, Revised Dept Freq Airborne, auto log-off 15 min after T/O At Cruise Flt, FL380

7 Flight 2, 22 May Ground Ops Logon successful Initial Clearance, CAF

8 Flight 2, 22 May Ground Ops Logon successful Initial Clearance, CAF
During Taxi, Revised Route (UM79)

9 Flight 2, 22 May Ground Ops Logon successful Initial Clearance, CAF
During Taxi, Revised Route (UM79) Airborne, ATC logoff 5 min after T/O – no problems No problems on FMC or ND approaching waypoints

10 Flight 3, 24 May Ground Ops Logon REJECTED

11 Flight 3, 24 May Ground Ops Logon REJECTED Initial Clearance, UM79

12 Flight 3, 24 May Ground Ops Logon REJECTED Initial Clearance, UM79
During Taxi, ATC unable to send UM80 Possible glitch in ARTCC rte build Revised Rte clnc via voice Airborne, auto log-off 5 min after T/O

13 Flight 4, 29 May Ground Ops Logon successful Initial Clearance, CAF

14 Flight 4, 29 May Ground Ops Logon successful Initial Clearance, CAF
During Taxi, Revised Rte (UM80) Scratchpad message

15 Flight 4, 29 May Ground Ops Logon successful Initial Clearance, CAF
During Taxi, Revised Route (UM80) Scratchpad message (PARTIAL F-PLN UPLINK) Printer problems After airborne, ATC logoff 5 min after T/O

16 Flight 5, 5 June Ground Ops Logon successful Unable to receive DCL
Simultaneous message on both DSP

17 Flight 6, 6 June Ground Ops Logon successful ATC unable to send DCL
DTAP reboot after flight plan filed

18 General Observations DCL has outstanding potential Positives
Route uplinks should reduce errors and time Reduce voice requirements Challenges Mitigate threat of misread messages Crew workload during taxi Comfort with CPDLC domestic operations

19