Subcommittee 2 Strategy Group
Offshore Structures Update Bob Wolfram Subcommittee 2 Strategy Group
2
OTC 19606: API Offshore Structures Standards: Changing Times
Dave Wisch Andrea Mangiavacchi OTC 19605: ISO Series: Offshore Structures Standards Richard Snell Dave Wisch
3
Impetus for Change Development of ISO series of offshore structures standards Hurricanes – Ivan Katrina Rita
4
Scope
6
RP 2A Materials and Floating Systems Post Hurricane Response
7
ISO TC 67 Reactivation SC 7 1st Meeting
8
Why change? API has done a very good job in developing good offshore structures standards and continues to do so. Why ISO
9
Factors causing change
Norwegian & UK and Classification Society regulations developed in part competing with API. EU structural standards programme initiated with stated aim of including offshore structures. Oil Companies moved from traditional geographic locations and suppliers to worldwide operations. Worldwide cross-industry trend to give lower credence to industry standards than national or international standards. Problem applied to the oil industry as a whole – not just offshore structures.
10
Industry Solution Develop a single set of Oil Industry Standards through ISO. Build on legacy of mainly API but also other industry standards. ANSI given chair and secretariat of the ISO Committee overseeing the development of Oil Industry ISO Standards. ANSI delegated secretariat to API. Seven Subcommittees SC 7 – Offshore Structures BSI Secretariat Large Work Plan, Multiple Work Groups and Panels
11
ISO Series Scope Standardisation of all forms of fixed and floating offshore structure used in the production and storage of petroleum and natural gas and site specific assessment of mobile offshore units.
12
Impact of the Terrible Triplets
Serious impact on offshore infrastructure and significant loss of production Keen interest from MMS on industry response Reassessment of metocean data and severe hurricane characteristics New insight into interaction with loop current Publication of 6 interim bulletins on hurricane design Metocean criteria for 4 sectors of GOM How to use this criteria for design of new and assessment of existing structures Accelerated schedule Reappraisal of the long term approach to standards
13
Longer Term Approach to Standards
Need for single metocean document – to be based on ISO Need for separate structural integrity management RP Removal of metocean, fire and blast and reassessment criteria from RP 2A implies significant restructuring of the document ISO standards reaching maturity and publication Heightened industry interest in standards but manpower resources scarce Maybe the time is now right to streamline the API offshore standards suite and align with the ISO standards per the original vision
15
API/ISO - “Wrapper”
16
API vs. ISO Alignment
17
API vs. ISO Alignment – 2010 Vision
18
RP/Spec – Castings/Forgings
2008 API Work Activities Resource Group Area Task Group & Standard RG 1 Metocean RP 2A –WSD RG 2 Mooring RP 2 Gen RG 3 Structural Elements RP 2 SIM RG 4 Loads – Hydrodynamics & Global Response RP 2 FPS RG 5 Structural Integrity Management RP 2 SK RG 6 Hull Structure Design RP 2 MET RG 7 Geotechnical RP 2 EQ RG 8 Materials/Fabrication RP 2 GEO RG 9 Topsides RP 2 WGT RG 10 Risers RP 2 MOP RG 11 Offshore Systems RP 2 SM RG 12 Marine Operations RP 2 I RG 13 Seismic Spec 2 C RG 14 Jackups RP 2 L RG 15 Pipelines RP 2 X RP 2 RD RP/Spec – Castings/Forgings