a Lufthansa Motivation to become a pioneer airline in LINK 2000+
2
Today’s ATC operational infrastructure is still based on
Where are we today ? Today’s ATC operational infrastructure is still based on radar tracking, voice communication & ground based radio beacons
3
Expectations ? co-operative solutions !
To be a LINK Pioneer To be a LINK Pioneer Expectations ? co-operative solutions ! Go ahead Thank you!
4
Facts Fragmented airspace (political & organisation)
Potential Data link widely unused No common use of data sources (air & ground) Lack of automation support No co-operative system approach No challenge for cost effectiveness through competition Today`s voice procedures can not be the basis to copy for future ATM It is important to avoid copying today's ground centered procedures – it would add complexity and inefficiency because it is exactly part of the problem to overcome!
5
Facts Capacity Efficiency Safety
Air Traffic Control with constraints to grow -- Capacity has reached a threshold limit value -- Elemental disruptions lead to significant negative effects on throughput, delay and safety Efficiency ATC unit cost regression by means of... ... automation and data based infrastructure ... flow oriented functional blocks of airspace Safety Increase safety margin
6
Facts Beneficiaries National Economies (passengers, cargo,mail) Airlines, ATSP’s and Airports Airframer and Vendors Facts (Eurocontrol Dokument; Performance Review Report PRR 5 for 2001) Traffic --> Forecast M (+5,3%); Actual (-0,6%) ATFM delay --> 27,6 M minutes respectively 3,1 minutes per flight Delays would have been some 35% higher if traffic had grown as planned 64% of ATFM delays were due to insufficient ATC Capacity Costs of en-route ATFM delays to M € and 2500 to 3700 M € if costs to passengers are added
7
Facts Airspace [mio. km²] 10,5 Hubs 27 USA: Airspace [mio. km²] 9,8
Europa: 1 ATC-Organization (civil + military) 21 En-Route-Center 1 Operating System 1 Programming language 900 Flights per Air Traffic Controller 380 US $ ATC-Unit costs / Flight 47 ATC-Organizationen (civil + military) 58 En-Route-Center 22 Operating Systems 30 Programming language 480 Flights per Air Traffic Controller 667 US $ ATC-Unit costs / Flight Quelle: PKT: IATA, BIP: DRI-Wefa
8
ATC Datalink achievements in the last years
D-ATIS in Germany, North America, and other locations since several years PDC in North America and DCL in Europe, wherever available OCX with Shanwick and Gander FANS 1 / A operation (Implementation 747 complete, A340 ongoing) Participation in several working groups, trials and studies
9
Challenges Phases of Air Traffic Management ADS-B
tactical strategic ADS-B air/air, air/grd (VDL M2 / ATN) Pre-flight FP co-ordination In-flight FPL co-ordination (Aircraft Flight Plan data exchange with ATM-units/airports) Aircraft Surveillance ASAS (->MTCD) ACAS (->STCA) minutes (not to scale) current position (time reference)
10
Challenges Today Tomorrow Air Traffic Control with constraints to grow
Air and Ground System ground based surveillance oriented on manual ground procedures Safety horizon < 1 min (ACAS) voice infrastructure airspace fragmented into small sectors Tomorrow Air Traffic Management with growth capability Co-operative Air-/Ground System air and ground based surveillance oriented on airspace user capabilities Safety horizon up to 30 min data infrastructure (voice for abnormal only) flow oriented functional blocks of airspace
11
one co-operative ATM Environment
Necessity one co-operative ATM Environment (ATC, Aircraft & Airline) is the precondition to ensure seamless global operation from GATE to GATE
12
Necessity Change the rules
New technical possibilities will lead to new or adapted rules and procedures Think Gate to Gate --> In-flight Flow Management over sector boundaries and national borders Route charges dependant on quality parameters Share task responsibilities according to best capabilities (pilot/controller or tactical/planer controller) Use of real 4D FMS Flight Plan data --> Stop predicting
13
Doubts ? Doubts on using FMS Flight Plan data?
Use of real 4D FMS Flight Plan data --> Stop predicting Doubts on using FMS Flight Plan data? Aircraft is the only source for altitude data, meteorological data and actual selected performance by the crew No redundant system on ground Level separation, monitoring on ground and ATSP altitude check procedures are based on aircraft altitude data only Reduced Vertical Separation Minima (RVSM) Is implemented, reduced level separation from 2000ft to 1000ft, based on aircraft altitude data only
14
Why supporting LINK 2000+ ? we need to get started
development and implementation takes years LINK is our chance to get duly entry access to future ATM structure developments LINK is not the end of the road but the right approach Europe/Eurocontrol needs to agree on a step by step transition plan towards a future CNS/ATM concept including related commitments from the relevant stakeholders! . . . if not, why should someone invest?
15
Why supporting LINK 2000+ ? Stop today´s rationing of scarcity.
Europe/Eurocontrol to step in for decision towards a future ATM concept. Europe/Eurocontrol to commit for co-operative future ATM applications. We need leadership to overcome the insufficient current ATC system . . . we cannot afford to wait.
16
Why supporting LINK ? Lufthansa supports the development of ATS Data Link in general, which is seen as a powerful tool to increase the efficiency of ATC. DLH has very good preconditions to support LINK due to the VDL Mode 2 AOA retrofit program Strong interest to participate in the development of procedures and HMI aspects
17
Why supporting LINK ? The objective of LINK is to implement an operational data link system for ATC in Europe. Strategically this will be a very important step. LINK respectively the technical infrastructure, VDL Mode2 ATN, will become an enabler for further developments.
18
X ??? Why supporting LINK2000+ ? 2020 Step 3 2003
Paradigm change required ! Current ATC procedures 2003 Step 3 2010 8.33kHz, RVSM, Link 2000+, PRNAV, etc. 2007 Step 2 based on automated in-flight Flow Management Co-operative 4D ATM System, and ASAS 2005 2003 Step 1
19
Lufthansa --> A committed ATM Partner
Concepts and services to cover co-operative ATM requirements are available ICAO based VDL M2/ATN is available Certified Avionics Package will be available soon Europewide technical infrastructure on ground is not available
20
Benefits Improve ATC availability
To increase air traffic controller availability Reduced communication through CPDLC Increase of airspace traffic capacity More movements per air traffic controller per sector should be accomodated, without loss of service level Most economic flight path for instructed a/c ATC continous to be responsible for the separation
21
Thank you for your attention !