Seismic Compliance Update California Hospital Association 2/20/2017

Similar presentations


Presentation on theme: "Seismic Compliance Update California Hospital Association 2/20/2017"— Presentation transcript:

1 Seismic Compliance Update California Hospital Association 2/20/2017

2 Structure Performance Categories
* Based on 2001 Hospital Survey Results based on hospital “self-report” and then “state-of-the-art” FEMA 178 standards from 1996 ** SPC-5 includes buildings currently under construction For SPC - "Not Assigned" is for non-building structures such as equipment yards, cooling towers etc that are still under construction

3 Hospital Seismic Compliance to Date
225 2/9/17 1088 Buildings 82.9% < 3 years left

4 SPC History ~ 3 years

5 SPC -1 Buildings = 225 SPC-1 Buildings with Approved SB 90 Extensions
169 SPC-1 Buildings with only SB 1661/AB2557/SB81 Extensions 18 SPC-1 Buildings with only SB 306 Extensions 26 SPC-1 Buildings that currently have an extension 213 SPC-1 Buildings that do not have any extension beyond 2013* 12 Total 225 *No acute care services – some of these building have removal-of-acute-care-services projects – all have been sent a letter urging removing building from inventory.

6 SPC-1 Buildings with Extensions beyond 1/1/2013 = 213
SPC-1 Buildings with expired SB 90 Extensions 15 SPC-1 Buildings with expired SB 1661 Extensions 18 SPC-1 Buildings that have expired extensions 33 SPC-1 Buildings with expired extensions that have occupancy/construction final - 26 Remaining* 7 * 4 of 7 have active revisions in OSHPD/FDD for extending the SB90 extension.

7 Buildings without approved extensions
Condition applied to 12 buildings with no extensions, 18 expired SB1661 extensions, 4 expired SB90 extensions thus far. A letter was sent to all facilities where condition was applied.

8 SB90 Extensions (169 – 19 with CO/CF = 150)

9 Nonstructural Performance Categories
***Includes buildings under construction, tunnels and equipment yards For NPC - "Not Assigned" are for buildings and nonbuilding structures either under construction or where the nonstructural performance category has not been verified

10 All Reports Submitted by
2016 SB499 Report Timeline Building Inventory/SB499 Preparation Letter – 6/29/16 Building Inventory/SB499 Preparation Reminder Letter – 7/25/16 Building Inventory Revisions cutoff deadline – 7/29/16 Release of Online Report with passwords – 8/26/16 Online Report Reminder Letter – 9/26/16 Online Report Warning Letter – 10/17/16 Online Report submittal deadline – Tuesday, 11/01/16 OSHPD Website Final Report posting deadline 2/01/17 All Reports Submitted by COMPLETED November 1, 2016 Posted 1/23/2017

11 2016 SB499 Reports on OSHPD Website

12 2016 SB499 Reports incorporated in Apps

13 Supervisor HFR, Seismic Compliance Unit
Contact Information: Hussain Bhatia Supervisor HFR, Seismic Compliance Unit