Eliminate Lost Time When Charging Process at Gravity Casting Line
Sharing to: Executive Meeting Eliminate Lost Time When Charging Process at Gravity Casting Line August, 2016 KS Engineering Casting PT. Akebono Brake Astra Indonesia Copyright PT. Akebono Brake Astra Indonesia All Rights Reserved.
2
Eliminate Lost Time When Charging Process at Gravity Casting Line
Background Eng Casting, August 2016 Any lost time for production when charging process (refill molten to holding & GBF process) Detail of lost time : 20 minutes every charging 10 times charging in one day 200 minutes every day linestop 1 holding 500 pcs lost every day for 1 holding (5 machine)
3
Eliminate Lost Time When Charging Process at Gravity Casting Line
Purpose Eng Casting, August 2016 Increase productivity by eliminating the line stops during the transfer molten and GBF process . Planning Solution Changing the model and system of holding furnace so that during the process of transfer molten & GBF, production can still operate (pouring process) and there is no line stop. Next model and system of holding furnace : Use double chamber holding furnace Consists of 2 chamber (supply area and outlet area) are interconnected and equipped with a liquid tap device to open / close the connecting lines. Supply area for charging / transfer molten & GBF process Outlet area for taking a molten (pouring process) At the time of the transfer of molten and GBF process in the supply area, operator can still take molten in the outlet area for pouring process. No line stop during the transfer of molten & GBF process
4
Eliminate Lost Time When Charging Process at Gravity Casting Line
Design New Model of Holding Furnace (Double Chamber) Eng Casting, August 2016
5
Eliminate Lost Time When Charging Process at Gravity Casting Line
Current Layout Eng Casting, August 2016 Cell #1 Cell #2 Cell #3 OFF Holding #11 Holding #12 OFF
6
Eliminate Lost Time When Charging Process at Gravity Casting Line
Next Layout Eng Casting, August 2016 Cell #1 Cell #2 Cell #3 OFF Holding #11 Holding #12 OFF
7
Eliminate Lost Time When Charging Process at Gravity Casting Line
Feasibility Study Financial Statement Eng Casting, August 2016
8
Eliminate Lost Time When Charging Process at Gravity Casting Line
Feasibility Study Financial Statement Eng Casting, August 2016 Conclusion : This project feasible to be done
9
Eliminate Lost Time When Charging Process at Gravity Casting Line
Time Schedule Eng Casting, August 2016