Presentation is loading. Please wait.

Presentation is loading. Please wait.

Huntington Convention Center of Cleveland &

Similar presentations


Presentation on theme: "Huntington Convention Center of Cleveland &"— Presentation transcript:

1 Huntington Convention Center of Cleveland &
Global Center for Health Innovation Presentation to Cuyahoga County Convention Facilities Development Corporation Board APRIL 21, 2017

2 EXISTING FLOOR PLAN

3 PROPOSED FLOOR PLAN

4 PROPOSED FLOOR PLAN –EXTERIOR ENTRY POINTS

5 PROPOSED FLOOR PLAN –INTERIOR ENTRY POINTS

6 PROPOSED FLOOR PLAN –FOLDING GLASS WALLS

7 PROPOSED FLOOR PLAN –OPEN TO ATRIUM

8 EXISTING CONDITIONS

9 PROPOSED – GLASS WALL CLOSED

10 PROPOSED – GLASS WALL OPEN

11 PROPOSED – EXTERIOR

12 CURRENT ACTIVITIES Preliminary fixture plan received. Lease negotiations under way. ABP preparing preliminary plans with new street entrance and collapsible storefront. Levy Restaurants finalizing budget. 3rd party site survey to begin. RLBA working with Starbucks to prepare preliminary estimates. Levy Restaurants finalizing budget.

13 NEXT STEPS RLBA to prepare statement of probable costs. RLBA to prepare construction documents to convert current space to vanilla shell. ABP to produce design development drawings. RLBA to prepare statement of probable costs. RLBA to prepare construction documents for tenant fit out. Starbucks to prepare schematic drawings for approval. (Expected start 5/9.) RLBA to prepare statement of probable costs.