Presentation is loading. Please wait.

Presentation is loading. Please wait.

Date of download: 10/16/2017 Copyright © ASME. All rights reserved.

Similar presentations


Presentation on theme: "Date of download: 10/16/2017 Copyright © ASME. All rights reserved."— Presentation transcript:

1 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: A schematic representation of proposed zero discharge desalination process

2 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: A photograph of the used solar pond

3 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: A photograph of the used forced circulation crystallizer

4 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: A schematic representation of (a) one side of solar pond with the locations of instruments; (b) front cut of distilled water part beside saline water part; and (c) different layers of wastewater in solar pond

5 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: Relation between density profile and height of wastewater in solar pond (from bottom to the top)

6 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: Various ambient average temperatures and related insolation rates during seasons

7 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: Variation of insolation rate with time (7 a.m. till 7 p.m.) on Jun. 17, 2012

8 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: Variation of average temperature of layers of wastewater and ambient temperature with different months (2012)

9 Date of download: 10/16/2017 Copyright © ASME. All rights reserved. From: Experimental Study of Solar Pond Coupled With Forced Circulation Crystallizer as Major Stages of Proposed Zero Discharge Desalination Process J. Thermal Sci. Eng. Appl. 2013;6(2): doi: / Figure Legend: Variation of the evaporation rate with insolation rate for different months (through 2012)


Download ppt "Date of download: 10/16/2017 Copyright © ASME. All rights reserved."

Similar presentations


Ads by Google