Presentation is loading. Please wait.

Presentation is loading. Please wait.

EN-Handling Engineering Group

Similar presentations


Presentation on theme: "EN-Handling Engineering Group"— Presentation transcript:

1 EN-Handling Engineering Group
Ingo RUEHL / EN-HE

2 EN-HE Organization Chart 2017
Handling Engineering Group I. Rühl EN-HE Organization Chart 2017 Deputy Group Leader C. Bertone Group Administrator – JM. Soudan Secretariat (50%) – M. Morer-Olafsen MANDATE provide transport and handling services for the technical infrastructure of CERN, accelerators and experiments this includes the design, the tendering/procurement, the installation, the commissioning, the operation, the maintenance and decommissioning of standard industrial and custom built transport and handling equipment Handling Maintenance H. Lourenco Lift Management D. Lafarge Heavy Handling C. Bertone Cranes G. Roche J.-P. Granchelli R. Rinaldesi O. Böttcher P. Bachmann (TTE) Industrial trucks J.-M. Chevalley B. Feral Maintenance Methods C. Bal J. Brun J-P. Lappe N. Perez Team ‘Handling’ S. Pelletier P. Brunero F. Daclin E. Dugue S. Fumey Y. Seraphin P. Vallet Team ‘Projects’ J.-L. Grenard J.-B. Bonnamy (VIA) M. Czech (F) F. Delsaux (IS – KA) Team ‘Transport’ T. Mazzarino R. Brun CERN - ITER workshop

3 EN-HE-Heavy Handling Section Mandate
prepares, organizes and executes all transport and handling operations for accelerators and experiments and CERN users in general manages several supply, service and rental contracts During the standard CERN operation phase ~55 FTE are provided via an industrial support contract for transport and handling activities. CERN - ITER workshop

4 Main contracts S172 Altéad (CH) : 55 (up to 100 FTE) for transport and handling operations C002 Frederici (CH) : Mobile crane and exceptional transport operations B1257 L2S (FR) : Mobile crane operations CERN - ITER workshop

5 Transport & handling requests
All requests are created via EDH (ELECTRONIC DOCUMENT HANDLING SYSTEM). Standard fields such as height, width, weight, place of loading and unloading,… but also Specific fields to define the nature of the material (fragile, radioactive, chemical, …) By default all transport and handling activities are covered up to CHF 500,000 by the contractor. This amount can be increased upon request (invoiced to requestor). CERN - ITER workshop

6 EDH home page CERN - ITER workshop

7 Internal transport and handling request
CERN - ITER workshop

8 CERN - ITER workshop

9 EDH Request Radioactive RP Unit Chemical HE responsible ADR
Conventional Conventional Dispatcher (QUALIAC) Radioactive, chemical > CHF Accord for the transport of Dangerous goods on the Road Accord pour le transport de materiel Dangereuse pour la Route MEYRIN SPS LHC PL SPL CRANES CERN - ITER workshop

10 Example – Procedure for the replacement of a SPS ‘Quadropole’
CERN - ITER workshop

11 CERN - ITER workshop

12 CERN - ITER workshop

13 Examples - Very special transports via contract C002
CERN - ITER workshop

14 Contractor’s workforce curve – Values and weights of materials transported.
CERN - ITER workshop

15 Statistics of T&H operations
Activity 2016 2015 2014 2013 2012 Mobile crane operations 1’718 1’933 Handling operations 2’728 2’574 Transports* 11’604 11’890 TOTAL n° of operations 16’050 16’397 25’477 22’389 18’565 TOTAL mass [kT] 113 80 203 173 84 TOTAL value [MCHF] 652 596 947 801 588 *1 Radioactive 1’334 1’468 *2 Dangerous goods (ADR 7) 679 387 CERN - ITER workshop

16 T&H operations SM18 : rotation and insertion of the vacuum cryostat and cryo-buffer in the new pit SM18 ICARUS : 1st cryostat rotation for welding. 2nd rotation already foreseen LINAC4: target installation inside steel dump CERN - ITER workshop

17 T&H operations FAIR : unloading and installation of 2 skids in building 279 SPS : transfer of the “hot” spare dump from build 954 to build 867 for repair ELENA : All dipoles and quadrupoles installed CERN - ITER workshop

18 Handling studies Design, integration and installation
PSB passage through the hopper with new magnets SPS : handling of the new cold box in BA06 HL-LHC: Passage and opening of the RUX 45 roof for new QRL for RF cryo- module 11-tesla-dypoles, CC and cryo-collimators: transport and installation to help design of the cryostat CERN - ITER workshop

19 Handling studies HL-LHC: Study of transport area in the new layout
Crab cavities Build 107: installation of degreasing machine CERN - ITER workshop

20 Main equipment families
DESCRIPTION CH FORKLIFTS (2 MOBILE CRANES 220t, 55t) 214 CS MAFI 65 RTH HEAVY ELECTRIC TRACTORS 36 RTL LIGHT ELECTRIC TRACTORS 119 RH TRAILERS (RTL, RTH) 185 LV LIFTING PLATFORMS 144 PR OVERHEAD TRAVELING CRANES 358 PA HOISTS 1221 HR LIFTING BEAMS 2623 PL TRUCKS 11 TR ROAD TRACTORS 9 ROAD TRAILERS CERN - ITER workshop

21 EN-HE – Industrial support and rental contracts
Altead Transport & Handling services on the CERN site E119 Manutention & Chariot Maintenance services on industrial trucks on the CERN site E121 Reel + Altead Specialized EOT crane maintenance services on the CERN site E111 As Ascenseurs Maintenance service for lifts on the CERN site E080 Ascenseurs Schindler Maintenance service for lifts (LHC) C002 Friderici Special Rental of heavy vehicles for the transport of goods B1419 Grunderco Sa Maintenance and repair activities on CERN heavy road vehicules B1257 L2S Truck crane rental with driver B1389 Loxam (FR) Lifting platforms rental (France) B1390 Loxam (CH) Lifting platforms rental (Suisse) CERN - ITER workshop

22 EN-HE – Supply contracts
B1455 Schindler Replacement of LHC lifts B1493 AS Ascenseurs Replacement of lifts in tertiary buildings B1421 Bonfanti Replacement and supply of EOT cranes up to 10 tonnes capacity B1422 Dismantling, refurbishment, replacement and supply of EOT cranes over 10 tonnes capacity B1458 Bemorail Crane rail consolidation CERN - ITER workshop

23 Handling is considered as high risk activity ‘SAFETY FIRST’
Summary Handling is considered as high risk activity ‘SAFETY FIRST’ INPUT Quality Timely PREPARATION Design, Integration Installation / operation manuals EXECUTION Authorized, qualified and experienced operators CERN - ITER workshop

24


Download ppt "EN-Handling Engineering Group"