1
Hammer Project Celcom CA SSO Project
celcom Lte FDD CA project PC_CA_ERE_08 oss KPI justification - Appendix © Ericsson AB 2017
2
PROJECT BAU MODERNIZATION
Multitech 2G kpi Justification
3
2G OSS Justification 2/23/2017-3/2/2017
# Description Target Value Technology Baseline KPI (1/2/2017~1/8/2017) Result(4/29/2017-5/5/2017) PASS/FAIL comments 2G A Cell Availability Maintain/Improved 99.57 99.71 PASS A CSSR_Voice 99.79 A DCR_Voice 0.15 A PS_Drop 1.18 1.16 A Timing Advance A CS Traffic 2/23/2017-3/2/2017 A TCH attempt A PS traffic(GB) 311.57 297.50 FAIL Refer to OSS Analysis(2/23/2017-3/2/2017)
4
2G OSS Justification-ps traffic
Baseline Result Performance analysis: 2G PS traffic decrease 14.61GB and 3G+4G PS traffic increased GB per week compared with baseline. 2G PS traffic decreased due to PS traffic shifted to 3G/4G; It shows 2G+3G+4G PS traffic increased after CA on air;
5
2g oss kpi graph
6
CA Project 3G OSS Justification © Ericsson AB 2016
7
3G oss kpi justification
CA Project SSO 3G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 3G to to A Cell Availability Maintain/Improved 99.29 99.69 Pass A CSSR_AMR 99.57 99.82 A CSSR_PS 99.65 99.74 A AMR Call Drop Ratio 0.26 0.13 A PS Service Drop Ratio 0.48 0.42 A SHO Success Rate (AMR Service) 99.72 99.71 Fail Refer to OSS Justification A SHO Success Rate (PS Service) 99.88 99.93 A HS-DSCH Service Cell Change Success Rate 99.98 A HSDPA RAB Setup Success Rate 99.05 98.88 A HSUPA RAB Setup Success Rate 99.87 99.85 A HSDPA Retainability 0.50 0.37 A HSUPA Retainability 0.47 0.35 A CS Inter-RAT Handover Success Ratio 99.83 A CS Inter-Frequency HHO Success Rate 94.69 98.29 *Refer to OSS Justification A PS Inter-Frequency HHO Success Rate 83.69 96.64 A RTWP A PRACH propagation delay(KM) 0.62 0.61 A CS Traffic(Erl) A CS RAB attempt PS RAB attempt A PS traffic(MB) © Ericsson AB 2017
8
3g sho amr JUSTIFICATION - 1/2
CA Project SSO 3g sho amr JUSTIFICATION - 1/2 SHO AMR was 99.71% which not pass baseline 99.72%, (0.01% less than the baseline), worst cells analysis pls see next slide © Ericsson AB 2017
9
3g sho amr JUSTIFICATION – 2/2
CA Project SSO 3g sho amr JUSTIFICATION – 2/2 The top offenders of AMR_SHO are shown in below table NBs to EW20246 failed lot. EW20246 has transmission interrupted alarms. Date RNC UtranCell UtranRelation SHO AMR Failure 10_SHO_Success_Rate_AMR UtranRelation.pmRlAddAttemptsBestCellSpeech UtranRelation.pmRlAddSuccessBestCellSpeech 5/25/2017 KBRN14 EW20004_1_2 EW20246_1_2 111 932 821 5/29/2017 93 889 796 5/30/2017 749 656 5/28/2017 91 729 638 5/24/2017 EW20003_1_2 EW20246_1_1 89 568 479 EW20048_1_3 618 529 85 777 692 EW20006_1_1 80 730 650 78 760 682 77 515 438 5/26/2017 76 431 355 73 634 561 EW20246_1_3 69 628 559 5/27/2017 67 572 505 64 697 633 465 401 63 367 304 EW20003_1_3 62 653 591 717 655 EW20004_2_1 EW20246_2_3 61 518 457 EW20048_1_1 511 450 SHO AMR was 99.71% which not pass baseline 99.72%, (0.01% less than the baseline), which caused by EW20246 interrupted alarms. © Ericsson AB 2017
10
3g hsDPA RAB SETUP SR JUSTIFICATION – 1/2
CA Project BBO 3g hsDPA RAB SETUP SR JUSTIFICATION – 1/2 10Apr CR Hsdpa RAB SR was 98.88% which not pass baseline 99.05%, (0.17% less than the baseline), worst cells analysis pls see next slides © Ericsson AB 2017
11
3g hsDPA RAB SETUP SR JUSTIFICATION – 2/2
CA Project SSO 3g hsDPA RAB SETUP SR JUSTIFICATION – 2/2 The top offenders of HSDPA_RAB SSR are shown in below table Worst cells EA20017 has antenna unbalance issue and alarms. After 10Apr CR slightly degraded No resource limitation found for RAB setup. UtranCell HSDPA RAB Attempt HSDPA RAB Success HSDPA RAB Failure HSDPA RAB SR EA20017_4_2 10149 9026 1123 EA20140_4_3 11453 10641 812 EA50594_4_1 26306 25611 695 EA50394_4_3 22046 21368 678 20032 19371 661 9795 9139 656 Hsdpa RAB SR was 98.88% which not pass baseline 99.05%, (0.17% less than the baseline), Worst cells EA20017 has alarms which already escalated on 8June. © Ericsson AB 2017
12
3g hsuPA RAB SETUP SR JUSTIFICATION – 1/2
CA Project BBO 3g hsuPA RAB SETUP SR JUSTIFICATION – 1/2 10Apr CR Hsupa RAB SR was 99.85% which not pass baseline 99.87%, (0.02% less than the baseline), Worst cells analysis pls see next slides © Ericsson AB 2017
13
3g hsuPA RAB SETUP SR JUSTIFICATION – 2/2
The top offenders of HSUPA_RAB SSR are shown in below table Worst cells EA20017 has antenna unbalance issue and alarms. After 10Apr CR slightly degraded No resource limitation found for RAB setup UtranCell HSUPA RAB Attempt HSUPA RAB Success HSUPA RAB Failure HSUPA RAB SR EA20017_4_2 51954 50840 1114 EA20140_4_3 90391 89581 810 EA50594_4_1 175153 174451 702 EA50394_4_3 112676 111996 680 161913 161248 665 79955 79299 656 Hsupa RAB SR was 99.85% which not pass baseline 99.87%, (0.02% less than the baseline), Worst cells EA20017 has attenna unbalance issue which escalated on 8June
14
3G ifho cs JUSTIFICATION – 1/3
CA Project SSO 3G ifho cs JUSTIFICATION – 1/3 time 14_CS_InterFrequency_HHO_Success_Rate 15_PS_InterFrequency_HHO_Success_Rate 1/2/2017 1/3/2017 1/4/2017 1/5/2017 1/6/2017 1/7/2017 1/8/2017 5/24/2017 5/25/2017 5/26/2017 5/27/2017 5/28/2017 5/29/2017 5/30/2017 10Apr CR 10th Apr 3G UeMeasControl nonUsedFreqThresh4_2bEcno KV/OKV Baseline_Allignment usedFreqRelThresh2fEcno WcdmaCarrier thresh2dRwrDrnc The IFHO_CS SR was 98.29% that pass the target 94.69%, but in baseline had 3 abnormal day on 6/7/8Jan, if excluded these 3 days, CS IFHO_SR was 98.96%, which means our post 98.29% can’t meet baseline(0.65% less than baseline), it caused by 10Apr CR. Pls refer to next page , especially above UeMeasControl and WcdmaCarrier parameter would affect CS/PS IFHO. the analysis for top offenders are shown in next slides. © Ericsson AB 2017
15
3G ifho cs JUSTIFICATION – 2/3
CA Project SSO 3G ifho cs JUSTIFICATION – 2/3 The top offenders of IFHO_CS are shown in below table IFHO_CS degraded after 10Apr CR done Top worst relations are co-site which should be kept Redundant IFHO NB relations pls see next slide In which EA20017 has antenna unbalance alarm which escalated on 8Jun EW20017 on 30May had celldowntimeauto issue UtranCell UtranRelation CS IFHO Attempt CS IFHO Success CS IFHO Failure CS IFHO SR EW20017_1_2 EA20017_4_3 85 38 47 EW20016_3_3 EW20016_1_3 125 103 22 82.4 EW20017_2_2 40 19 21 47.5 EW20009_3_2 EW20009_1_2 337 317 20 EW20009_2_2 78 62 16 EA20140_4_3 EW20046_1_2 171 158 13 EW20017_1_1 EA20017_4_2 296 284 12 EW20017_2_1 143 131 © Ericsson AB 2017
16
3G ifho cs JUSTIFICATION – 3/3
RNC UtranCell UtranRelation CS IFHO Attemt CS IFHO Success CS IFHO Failure CS IFHO SR PS IFHO Attemt PS IFHO Success PS IFHO Failure PS IFHO SR Proposal KBRN14 EW20006_2_1 EW20048_1_1 5 !DIV0! Delete redundant IFHO NB EW20164_2_1 EW20014_1_1 EA50164_4_2 EW20018_1_2 4 EW20016_1_3 EA50416_4_1 EW20017_2_1 3 1 100 EA20140_4_1 EW20021_1_2 EW20009_1_3 EA50247_4_2 2 EW20003_2_2 EW20302_1_1 6 75 EW20034_2_2 EW20254_1_1 20 EW20005_1_2 EA50247_4_1 25 9 EW20141_3_3 EW20163_1_1 CS IFHO redundant NB relations show above, that would combined with PS IFHO redundant NB together then submitted on 14Jun,2017
17
3G ifho ps JUSTIFICATION – 1/3
CA Project SSO 3G ifho ps JUSTIFICATION – 1/3 time 14_CS_InterFrequency_HHO_Success_Rate 15_PS_InterFrequency_HHO_Success_Rate 1/2/2017 1/3/2017 1/4/2017 1/5/2017 1/6/2017 1/7/2017 1/8/2017 5/24/2017 5/25/2017 5/26/2017 5/27/2017 5/28/2017 5/29/2017 5/30/2017 10Apr CR 10th Apr 3G UeMeasControl nonUsedFreqThresh4_2bEcno KV/OKV Baseline_Allignment usedFreqRelThresh2fEcno WcdmaCarrier thresh2dRwrDrnc IFHO PS was 96.64% that pass the baseline 83.69%, but in baseline had 3 abnormal day on 6/7/8Jan, if excluded these 3 days, PS IFHO_SR was 98.40%, which means our post 96.64% can’t meet baseline(1.76% less than baseline), it caused by 10Apr CR, Pls refer to next page, especially above UeMeasControl and WcdmaCarrier parameter would affect CS/PS IFHO, the analysis for top offenders are shown in next slides. © Ericsson AB 2017
18
3G ifho ps JUSTIFICATION – 2/3
CA Project SSO 3G ifho ps JUSTIFICATION – 2/3 The top offenders of IFHO_PS are shown in right table IFHO_PS degraded after 10Apr CR done Top worst relations are co-site which should be kept In which EA20017 has antenna unbalance alarm EW20017 on 30May had celldowntimeauto issue RNC UtranCell UtranRelation PS IFHO Attemt PS IFHO Success PS IFHO Failure PS IFHO SR KBRN14 EW20017_1_1 EA20017_4_2 3881 3534 347 EW20017_1_2 EA20017_4_3 824 485 339 EW20017_2_2 811 472 EW20017_2_1 2567 2347 220 EA20009_4_2 EW20018_1_2 173 EW20048_1_3 EA50422_4_1 273 138 135 EW20009_1_2 EA50528_4_1 3191 3085 106 EW20009_3_2 1217 1112 105 EW20017_2_3 EA20017_4_1 1036 934 102 EW20009_2_2 227 125 EW20017_1_3 892 793 99 131 46 85 © Ericsson AB 2017
19
3G ifho ps JUSTIFICATION – 3/3
RNC UtranCell UtranRelation PS IFHO Attemt PS IFHO Success PS IFHO Failure PS IFHO SR CS IFHO Attemt CS IFHO Success CS IFHO Failure CS IFHO SR Proposal KBRN14 EA20009_4_2 EW20018_1_2 173 !DIV0! Delete redundant IFHO NB EW20186_1_1 16 EW20140_1_1 EA50193_4_1 15 EW20017_1_2 EA50250_4_3 13 EW20034_1_3 EA50019_4_1 EW20006_2_2 EW20003_1_2 12 EA50394_4_2 EW20021_1_2 10 EW20034_1_1 EW20163_1_1 EA50019_4_2 EW20017_1_1 EA50594_4_1 8 EW20246_1_2 EA20366_4_2 7 EA50164_4_1 6 1 100 EW20247_1_2 5 3 2 60 EW20009_1_2 EA50043_4_2 EA20004_4_3 EW20003_1_3 EA20009_4_3 EW20108_2_1 EA50394_4_3 EW20246_1_3 EW20258_2_3 EW20006_1_2 EA50398_4_2 EA50104_4_1 EW20017_1_3 EW20140_1_3 EW20247_3_1 EA50247_4_2 EW20250_1_2 EA50426_4_1 PS IFHO redundant NB relations show above, that would combined with CS IFHO redundant NB together then submitted on 14Jun,2017
20
CA Project BBO 3G RTWP JUSTIFICATION 28Jan PS_Vol suddenly increased lot while CS traffic decreased RTWP was which not meet baseline , which caused by PS traffic increased lot, it considered normal fluctuation © Ericsson AB 2017
21
3G CS TRAFFIC/CS RAB ATTEMPT JUSTIFICATION – 1/2
28Jan PS_Vol suddenly increased lot while CS traffic decreased CS Traffic(Erl) was Erl that not meet baseline Erl(2830.6Erl descrepency), while CS RAB Attempt was what less than baseline (11078), which caused by PS traffic increased lot from 28Jan, CS/PS traffic trend/analysis pls see next slide.
22
3G CS TRAFFIC/CS RAB ATTEMPT JUSTIFICATION – 2/2
CA Project SSO 3G CS TRAFFIC/CS RAB ATTEMPT JUSTIFICATION – 2/2 Baseline 28Jan PS_Vol suddenly increased lot while CS traffic decreased Result CS Traffic/CS RAB Attempt decreased while PS traffic increased about 25% from 28Jan. It considered user behavior migrated. Like facebook/wechat/twitter,etc. Also, this cluster covers Sultan Ismail Petra Airport that tourists also affect traffic trend. © Ericsson AB 2017
23
Hammer Project Celcom CA SSO Project
4G OSS Justification © Ericsson AB 2017
24
Celcom LTE CA Project_OSS
4G oss kpi justification © Ericsson AB 2017
25
Celcom LTE CA Project_OSS
Data CSSR & RRC CSSR & RRC Service & erab CSsr Analysis: The CSSR for Data ,RRC,RRC service and eRAB of the neighbor sites are 99.80%, 99.92%, 99.95%, 99.89% which has a slight degradation compare with the baseline 99.86%, 99.95%, 99.97%, 99.91%. The degradation is mainly cause by the adjusting of qrxlevmin (from -120 to -124) which aiming to keep more users on 4G, the subscribe at the cell edge will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail. Baseline qrxlevmin Result © Ericsson AB 2017
26
Celcom LTE CA Project_OSS
eRAB Drop Call Rate Analysis: The eRAB DCR for the neighbor site is 0.13% which is worse than baseline 0.08% was mainly due to the CA layer management parameters changed on whole OKV. CA layer management parameters was aiming to keep more users on 4G, which means the subscribe in cell edge will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail. Baseline CA layer management parameters change Result Result © Ericsson AB 2017
27
Celcom LTE CA Project_OSS
UL Packet Loss Rate Analysis: The UL Packet Loss Rate for the neighbor site is 0.19% which is a litter worse than baseline(0%). UL Packet Loss Rate increase since feature TCPO activated. Feature TCPO will impact on counter pmpdcpPktLostUI shows in Alex. The TCP Optimization feature is useful to provide a low queuing delay, while maintaining high link utilization and thereby improving the perceived end-user performance in terms of system responsiveness without sacrificing throughput. The feature is also capable of maintaining a more stable cell throughput under load, and will benefit the DL packet loss as below; UL Package Loss Rate=100*[pmpdcpPktLostUI/(pmpdcpPktLostUI+pmpdcpPktReceivedUI)] Feature TCPO Activated Result Baseline © Ericsson AB 2017
28
Celcom LTE CA Project_OSS
Intra-LTE Handover Success Rate Analysis: The Intra LTE Handover Success Rate for the neighbor site is 99.72%, which is a little worse than baseline(99.81%). The decreasing in a2 and a5 (a2ThresholdRsrpPrim -114 and a5Threshold1Rsrp -117 for L2600) were aiming to keep more users on LTE especially in L2600, which means the subscribe in cell edge will stick to L2600 with low poor RF condition while the LTE total volume increased as a result. Baseline Result CA layer management parameters change © Ericsson AB 2017
29
Celcom LTE CA Project_OSS
Network Availability Cell Level Analysis: The baseline for the neighboring site network availability is 99.81%,the result KPI is 99.72%, as below picture shows that network availability Trend chart, During the result time period, the Availability is below the baseline, Fetching the related counters shows top 15 cells, The mainly contribute is the cell EL20254.it is due to site alarm, and KPI recovery in the later days. Baseline Result CA layer management parameters change © Ericsson AB 2017
30
Celcom LTE CA Project_OSS
Voice Traffic (LTE+3G+2G) Analysis: The Voice Traffic (LTE+3G+2G) for the neighbor site is which is a little lower than baseline More users have more activities on data instead of voice. So we can see that data traffic increased a lot through below picture. Baseline Result © Ericsson AB 2017
31
Hammer Project Celcom CA SSO Project
© Ericsson AB 2017