1 ELCITA UPDATE AUGUST 2017

2 Smart City Project Initiatives for Test bed
97 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.

3 Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue – 17 West Avenue 2 – Velanakani Road - 20 West Avenue 7 – Teknic to Wipro Gate West Avenue 8 – Pump house Road - 31 West Avenue 9 – Petrol Bunk Road – 18 E – Toilets 20 e-toilets Installed & Operational

4 LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

5 DETAILED DRAWING FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

6 Asphalting - Pump house Road (West Avenue 8).
Road Work – Completed Asphalting - Pump house Road (West Avenue 8).

7 Laying Wet Mix for Vehicle Movement - KIADB
Road Work – Under Progress Laying Wet Mix for Vehicle Movement - KIADB

8 RCC drain & Footpath– West Avenue 6
Footpath Works – Under Progress RCC drain & Footpath– West Avenue 6

9 Footpath Work – Under Progress
MRO Tek side (West Avenue 9) Quasitum side (East Lane 2)

10 Footpath Work – Under Progress
Service Duct Line at Footpath (West Avenue 2) 3m jn to Y Jn (West Avenue 9)

11 Footpath Work – Under Progress
Drain Cleaning (East Avenue 4 ) Tata power to Print (East Avenue 1)

12 Footpath & RCC Pedestal– Under Progress
RCC Drain & Footpath (East Avenue 2) RCC pedestal for Street light Pole (West Avenue 2)

13 RCC Culvert & Footpath Work – Under Progress
Near NRN Holdings (West Avenue 9) Electrical Work (West Avenue 8)

14 Misc Work – Under Progress
Treated Water Sump for 7 KLD STP at ELCITA Office Chequer sheet for Drain Slab for Easy access (West Avenue 1)

15 Chequer Sheet Slab– Under Progress
3M Side (BHEL Jn) Near Infosys Ground Near HP Gate (Velankani Road) Edizi Tools Junction Improvement (East Avenue 4)

16 RCC Culvert Work– Under Progress
Exa Thermometrics (West Avenue 6) Opto Circuits (West Avenue 1)

17 Edizi Tools Junction Improvement (East Avenue 4)
Road Widening Work – Under Progress Edizi Tools Junction Improvement (East Avenue 4)

18 Road Widening Work – Under Progress
Y Junction (East Phase) Road Widening (East Avenue 1)

19 New Street Light Pole (East Avenue 1)
Street Light Fixing– Completed New Street Light Pole (East Avenue 1)

20 Kerbstone Painting– Completed
West Avenue 8 West Avenue 4

21 Fabrication Work – Completed
Barbide wire Fencing for Trespassers – West Avenue 1 (Near Toll Plaza) Providing MS Railing for pedestrian safety – West Avenue 1 (Near NTTF)

22 Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase

23 Tender – Under Evaluation
Replacing Existing 6 Way old type MEI make conventional type RMU by 6 Way Compact type Schneider RMU DAS specification for F-5 Feeder Eminating from Keonics Muss near M/s BHEL Ltd, Electronics City West Phase, Bangalore Providing and Laying Asphalting grade bitumen from 3m Junction to Petrol Bunk Junction, West Lane 6 and West Avenue 9, Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen along West Lane 7, 8,9 and 10, West Avenue 11 Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen from Konar to KPTCL, West Avenue 3 and 5 Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen along East Avenue 5 Electronics City West Phase, Bangalore

24 Contracts on Anvil Providing House Keeping Services to ELCITA within e-city Industrial Township Area. Providing Services for Solid Waste Management  to ELCITA within e-city Industrial Township Area. Providing Services for lifting sewage/Treated water by using Tanker Vehicle within e-city Industrial Township Area. Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer & Raising of Transformer by installing new Spun Pole for Junction Improvements at 3m & BHEL Side, Electronics City West Phase, Bangalore 4.Construction of 400 KLD STP in KSSIDC Land, West Phase. 5. Construction of 500 KLD STP in KIADB Land, East Phase.