1
Problem 1 Demand Total There are 20 full time employees, each can produce 10 units per period at the cost of $6 per unit. Therefore the supply of full time workers is as follows Total Overtime cost is $13 per unit. Inventory carrying cost $5 per unit per period Backlog cost $10 per unit per period Maximum over time production is 20 units per period Formulated the problem as a Linear Programming model. Using excel and solver find the optimal solution.
2
Solution to Problem 2
3
Changing Cells
4
RHS
5
LHS
6
LHS
7
Cost Table; Format
8
Production Cost; Regular, Overtime
9
Inventory Cost
10
Inventory Cost for All Periods
11
Backlog Cost
12
Backlog Cost for All Periods
13
Target Cell
14
Changing Cells
15
Constraints
16
Target Cell, Changing Cells, Constraints
17
Change to Min
18
Options
19
Solve
20
Objective Function Value
21
Problem 2
22
LP Formulation; Supply and Demand
23
LP Formulation; Cost Parameters
24
LP Formulation; Sumproduct and Constraints
25
LP Formulation; Optimal Solution