ELCITA UPDATE November 2016
2
Estate Management E – Toilets
16 e-toilets operational. 2 More E- Toilet Installation Work in Progress Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Acceptance check in progress.
3
IIITB College, West Avenue-1 (Infosys Avenue)
Footpath Works – Under Progress IIITB College, West Avenue-1 (Infosys Avenue)
4
Detail Three Year Plan for Footpath works in ECity West & East Phase.
SI.NO THREE YEAR PLAN AMOUNT in Crs 1 FIRST YEAR - upto MARCH 2017 7.52 2 SECOND YEAR - APRIL 2017 to MARCH 2018 13.23 3 THIRD YEAR - APRIL 2018 to MARCH 2019 11.86 TOTAL 32.62 At the Rate of Rs. 4,375/- per Sqm
5
Road Works – Under Progress
East Avenue-5 (SBI Road) West Avenue-1 (IIITB Side)
6
KSSIDC Complex Internal Road
Road Works – Under Progress KSSIDC Complex Internal Road
7
Culvert Works – Under Progress
Culvert Work along West Lane-1 (Goa Estate) Culvert Work along West Avenue-7 (Wipro Neeladri)
8
Footpath Works – Under Progress
Pavers Work for Transformer Yard @ MSME Replacing existing chamber cover -RCC slab with Chequered Plate,
9
Landscape Work– Under Progress
Landscaping work below fly over & the median located in East Phase.
10
Sewer Works – Completed
Construction of 80 KL Capacity Septic Tank (KSSIDC) & Sewer line work, West Avenue-10 (Canara bank road)
11
Drain Works – Completed
Drain Work along East Avenue-1 (TCS Road) SSM Drain work along West Avenue-5 (Ramakrishna Hospital)
12
Misc Works – Completed Median Work along West Avenue-5 (KP Entrance)
Levelling MSME Building Median Work along West Avenue-5 (KP Entrance)
13
Fabrication work for 300KLD STP
Fabrication Works – Completed Fabrication work for 300KLD STP
14
RS Junction Water line Work
Water Pipe Line Work – Completed RS Junction Water line Work
15
Footpath Works – Completed
Footpath work at KSSIDC Complex Footpath work at Salarpuria
16
Misc Works – Completed Construction of Compound wall & MS Fencing Work at KIADB land, East Phase
17
3KL capacity Sump at Median for Landscaping, East Phase
Water sump Works– Completed 3KL capacity Sump at Median for Landscaping, East Phase
18
Forbes Marshall Multi parameter COD/BOD/PH/TSS Analyzer
Sustainability Projects Forbes Marshall Multi parameter COD/BOD/PH/TSS Analyzer Used to measure the quality of treated water before using it for irrigation, cleaning purposes or giving it to anyone else. The PCB has specified to test specific parameters such as COD/BOD/PH/TSS These parameters can be monitored online by us and CPCB Description Cost Unit Cost 16,30,000/- Software for CPCB connectivity & for data logging 1,50,000/- Cables etc (Approx) 20,000/- Total(Approx) 18,00,000/- Charges for Soft DAS for SPCB connectivity: 1,50,000 Extra when applicable The operating cost is limited to the refilling of the 2-litres tank of cleaning solution every 2 weeks with 5% Sulphuric acid on distilled water.
19
Sustainability Projects
RWH works – Under Progress SI.NO DESCRIPTION NO OF PITS STATUS 1 RAIN WATER HATVESTING PIT 49 COMPLETED 2 WORK IN PROGRESS
20
20 feet deep well Rainwater Harvesting Pit at Various locations
21
Estate Management Contract Awarded
Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road KSSIDC Complex Internal Roads
22
Tender Under Evaluation
Estate Management Tender Under Evaluation Providing Security Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along Petrol Bunk Road & Golden Tulip Road.
23
Estate Management Contracts on Anvil
Providing House Keeping Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road, Electronics City East Phase. Erkadi System to Arvind Mills Construction of 500 KLD STP in KIADB Land, Electronics City East Phase.