Replacement of Vehicle Bridge over Spring Creek Centre County, PA
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Stratton Oakmont Team 5 Neil Tufano Jeff Irwin John Seidts Dapo Omotoba Presented to: Prof. Berezniak Spring 2017
2
Statement of the Problem
100-Year flood Centre County, PA Emergency services cut off
3
Project Objective
4
Required Design Criteria
Deck span of 40 meters 20 meters high .23 meter thick medium strength concrete Must be Howe/Warren
5
The Technical Approach Phase 1: Economic Efficiency
Engineering Encounters Bridge Design 2016 (EEBD 2016) Simulated load software Calculated various costs
6
The Technical Approach Phase 2: Structural Efficiency
60 popsicle sticks maximum Elmer’s Glue Hot Glue
7
The Results Phase 1: Economic Efficiency
Dennis H. Mahan Memorial Bridge Project ID: 00002A- Iteration #189 (Fri, 10 Feb 2017, 08:58:21) Type of Cost Item Cost Calculation Cost Material Cost (M) Carbon Steel Solid Bar ( kg) x ($4.30 per kg) x (2 Trusses) = $141,965.62 Carbon Steel Hollow Tube ( kg) x ($6.30 per kg) x (2 Trusses) = $18,303.84 Connection Cost (C) (22 Joints) x (400.0 per joint) x (2 Trusses) = $17,600.00 Product Cost (P) x60 mm Carbon Steel Bar (%s per Product) = $1,000.00 2 - 65x65 mm Carbon Steel Bar (%s per Product) = $1,000.00 1 - 80x80x4 mm Carbon Steel Tube (%s per Product) = $1,000.00 3 - 90x90 mm Carbon Steel Bar (%s per Product) = $1,000.00 x100 mm Carbon Steel Bar (%s per Product) = $1,000.00 x100x5 mm Carbon Steel Tube (%s per Product) = $1,000.00 x110 mm Carbon Steel Bar (%s per Product) = $1,000.00 x120 mm Carbon Steel Bar (%s per Product) = $1,000.00 x120x6 mm Carbon Steel Tube (%s per Product) = $1,000.00 x130 mm Carbon Steel Bar (%s per Product) = $1,000.00 x130x6 mm Carbon Steel Tube (%s per Product) = $1,000.00 x140 mm Carbon Steel Bar (%s per Product) = $1,000.00 x150 mm Carbon Steel Bar (%s per Product) = $1,000.00 x160x8 mm Carbon Steel Tube (%s per Product) = $1,000.00 Site Cost (S) Deck Cost (10 4-meter panels) x ($4, per panel) = $47,000.00 Excavation Cost (19,400 cubic meters) x ($1.00 per cubic meter) = $19,400.00 Abutment Cost (2 standard abutments) x ($5, per abutment) = $11,000.00 Pier Cost No pier = $0.00 Cable Anchorage Cost No anchorages = $0.00 Total Cost M + C + P + S $160, $17, $14, $77, = $269,269.46 Dennis H. Mahan Memorial Bridge Project ID: 00002A- Iteration #112 (Fri, 3 Feb 2017, 09:36:48) Type of Cost Item Cost Calculation Cost Material Cost (M) Carbon Steel Solid Bar ( kg) x ($4.30 per kg) x (2 Trusses) = $127,984.48 Carbon Steel Hollow Tube (714.8 kg) x ($6.30 per kg) x (2 Trusses) = $9,006.78 Connection Cost (C) (26 Joints) x (400.0 per joint) x (2 Trusses) = $20,800.00 Product Cost (P) x45x2 mm Carbon Steel Tube (%s per Product) = $1,000.00 4 - 65x65 mm Carbon Steel Bar (%s per Product) = $1,000.00 2 - 75x75 mm Carbon Steel Bar (%s per Product) = $1,000.00 1 - 80x80 mm Carbon Steel Bar (%s per Product) = $1,000.00 3 - 90x90 mm Carbon Steel Bar (%s per Product) = $1,000.00 x100 mm Carbon Steel Bar (%s per Product) = $1,000.00 x100x5 mm Carbon Steel Tube (%s per Product) = $1,000.00 x110 mm Carbon Steel Bar (%s per Product) = $1,000.00 x120 mm Carbon Steel Bar (%s per Product) = $1,000.00 x120x6 mm Carbon Steel Tube (%s per Product) = $1,000.00 x130 mm Carbon Steel Bar (%s per Product) = $1,000.00 x140 mm Carbon Steel Bar (%s per Product) = $1,000.00 x140x7 mm Carbon Steel Tube (%s per Product) = $1,000.00 Site Cost (S) Deck Cost (10 4-meter panels) x ($4, per panel) = $47,000.00 Excavation Cost (19,400 cubic meters) x ($1.00 per cubic meter) = $19,400.00 Abutment Cost (2 standard abutments) x ($5, per abutment) = $11,000.00 Pier Cost No pier = $0.00 Cable Anchorage Cost No anchorages = $0.00 Total Cost M + C + P + S $136, $20, $13, $77, = $248,191.26\
8
The Results Phase 2: Structural Efficiency
9
The Best Solution Howe Bridge Warren Bridge
10
Our Conclusions/Recomendations
Greater Structural Efficiency Greater Design Efficiency Overall greater performance Possible design/material changes to further decrease cost Test on a greater scale