Sheldon (Maple to Library) Preferred Design Meeting 12-6-16
2
Introductions Breese Stam – City Engineering Wes Steer – OCBA
Jon Re – City Traffic Safety Layla Aslani – City Community Engagement
3
Agenda Introductions Project Overview Meeting and Survey Results
Preferred Design Discussion
4
Project Overview
5
Project Limits Maple to Library North
6
Construction Sheldon (Weston to Fulton) – reconstruction in 2017
Other sections to be reconstructed in the coming years Upgrade sidewalks and ramps to be compliant with the Americans with Disabilities Act North
7
Approximate Funding Sheldon (Weston to Fulton)
Total Cost ≈ $927,492 Sewer ≈ $268,000 DDA ≈ $268,000 Vital Streets ≈ $199,492 Water ≈ $192,000
8
Meeting and Online Survey
We’ve heard support for: changing the street from a one-way to a two-way between Maple and Fulton. maintaining the street as a one-way between Fulton and Library. installing bike facilities in the right of way. maintaining as much parking as possible with the new design. greening the street with the existing and/or new trees. keeping as much of the existing green space towards Maple as possible. not placing seating by the YWCA.
9
Preferred Design
10
Discussion
11
Contact Information Road construction website: grcity.us/roadconstruction City phone number: 311 or