Download presentation
Presentation is loading. Please wait.
1
Greenland – Iceland, New opportunities
How will changes in surface and air transportation between Iceland and Greenland effect engineering services? Tryggvi Jónsson, manager of marketing and buisiness development September 5th 2017
2
Mannvit at a glance An international consultancy firm offering a wide range of services in the fields of engineering, project management, geoscience, environmental studies, IT, construction material research and EPCM contracting. Founded in 1963. 300+ Employees Employee-owned by aprox 80 shareholders Turnover in 2016: DKK 320 million Management Systems certified: ISO 9001, ISO 14001, OHSAS 18001
3
Mannvit‘s offices Headquarters and 9 offices in Iceland ICELAND
GREENLAND ICELAND NORWAY UK GERMANY HUNGARY USA INDONESIA CHILE Mannvit‘s offices Headquarters and 9 offices in Iceland
4
Greenland Project Examples
Qorlotorsuaq & Tasiilaq, Greenland Hydroelectric Power Plants Size: 8 MWe and 1,2 MWe Year: Role: Construction Mgmt., Site Supervision, Hydraulic, Waterways, El-Mech and Civil Work, Electrical Transmission, Tender Documents, Testing and Commissioning Nuuk harbour Extension Size: Quay 310 m, DKK 620 M Year: Role: Construction Management, owners engineer. Qorlotorsuaq Greenland Power transmission Size: 2 km fjord crossing Year: Role: Conceptual and detailed design for a 2 km fjord crossing where conventional methods were not available due to heavy currents and icebergs. Also responsible for procurement and site supervision.
5
Greenland Project Examples
Daneborg Oil depot in Greenland Project: Renewal of the oil depot at the Daneborg military base on the east coast of Greenland. Year: Role: Mannvit was a sub-contractor in this project to Per Aarsleff AS. Mannvit was responsible for engineering in the fields of electricity, mechanics and load-bearing structures. Station Nord Military airport in NA Greenland Project: Renewal of the oil depot at Station Nord military airport in northeastern part of Greenland. Year: Role: Mannvit was a sub-contractor in this project to Per Aarsleff AS. Mannvit was responsible for engineering in the fields of electricity, mechanics and load-bearing structures. Kangerlussuaq Storage project Project: Renovation of aviation fuel storage tank and fuel service equipment for Air BP. Year: Role: Engineering, procurement and construction management (EPCM).
6
Projekter i Grønland Ny Lufthavn i Tasiilaq
Ny Lufthavn i Ittoqqortoormiit Pre-feasibility study Bygherre: Regeringen i Grønland Byggesum: N/A År: 2015- Rolle: Preliminary study, Preliminary design, Estimation of the project cost, Environmental requirements and planning, Field investigation, Navigation, Meteorology, Flight procedure designing more details and mapping. Geotechnical feasibility study. Ny Lufthavn i Tasiilaq Pre-feasibility study Bygherre: Regeringen i Grønland Byggesum: N/A År: 2015- Rolle: Preliminary study, Preliminary design, Estimation of the project cost, Environmental requirements and planning, Field investigation, Navigation, Meteorology, Flight procedure designing more details and mapping. Geotechnical feasibility study.
7
Energy Projects Búrfell Sigalda Vatnsfell
Hydroelectric Power Plant, Iceland Size: 270 MW Project Cost: 300 m € Year: 1967 - Role: Site investigation, civil works design, structural- , mech.- design. Refurbishment. Construction management Sigalda Hydroelectric Power Plant, Iceland Size: 150 MW Project Cost 200 m € Year: Role: Lead design Vatnsfell Hydroelectric Power Plant, Iceland Size: 90 MW Project Cost 130 m € Year: Role: Lead design
8
Energy Projects Krafla, Iceland Nesjavellir Theistareykir
Geothermal Power Plant Size: 60 MWe Year: 1974- Role: Lead engineering, PM, Testing and commissioning, acceptance test, training of operators, EIA Nesjavellir Geothermal Power Plant in Iceland Size: 120 MWe, 300 MWt Project Cost 600 m € Year: Role: Lead design Theistareykir Geothermal Power Plant in Iceland Size: 1st and 2nd phase 2x45 MWe Project Cost 1st phase m € Year: Role: Lead design, reservoir modelling, well design, drilling supervision, project management, tender & procurement docs, detail design, supervision mechanical installation, supervision assistance for control equipment installation, EIA of plant & transmission lines, HV transmission lines & substations.
9
Industry Projects Rio Tinto Alcan, Straumsvik, Iceland
Aluminium smelter upgrade Size: tpy Year: Buit 1995 – 2013 Role: EPCM Century Aluminum, Grundartangi Aluminium smelter, Iceland Size: tpy Project Cost: 800 m € Year: Role: EIS, EPCM Hydro Aluminium Karmöy New potline, Norway Size: tpy Project Cost: 3500m DDK Year: World Role: EPCM
10
Technical capacity in Iceland 2017
Very strong technical society and high technical standard Engineering jobs created and foreign revenues Engineering is now international business Strong local contractors Three firms with staff of 300+ Total turnover per year approx. $200M Co-operation with international firms when needed Up to $500M $500M - $1000M $1000M +
11
Technical capacity in Greenland 2037
Very strong technical society and high technical standard Engineering jobs created and foreign revenues Engineering is now international business Strong local contractors Three firms with staff of 300+ Total turnover per year approx. $200M Co-operation with international firms when needed Up to $500M $500M - $1000M $1000M +
13
How will changes in surface and air transportation between Iceland and Greenland effect engineering services?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.