Soil Condition Piling Foundation Framing options Span length Steel Structure Loading Codes RFI to Clients
3
SOIL CONDITION Clay WEAK 40m depth
4
PILING Bored Pile Jacking Pile R.C pile P.C pile
5
CALCULATION MODEL
6
PILING
7
PILING Bored Pile D800 Depth >45m 1 column 1 pile 1 pile = 450Ton
Too much for some Cols
8
PILING Driven Pile: Hammer NOISY AFFECT TO SURROUNDING NOT FLEXIBLE
FIT FOR STIFFER SOILS
9
PILING Jacking Pile SELECT P.H.C PILE Work same Same price Faster R.C
10
12m 50T 30m 120T
11
PILING PLAN D350: 24 no. 1 pile 1 column D450: 248 no.
for columns support RC slabs PILING PLAN
12
COMPARE PILING OPTIONS
Bored Pile Jacking Pile D800 D350 D450 Number 117 24 248 Depth of 1 pile (m) 45 12 30 Total Depth (m) 3273 288 7440 Unit price (Mil. VND/m depth) 4.12 0.35 0.62 Price (Mil. VND) 13,485 101 4,613 4,714 * Roughly estimate → SELECT P.H.C PILE
13
SLAB ON GRADE 1st Floor Slab on grade (SOG)
Separate with Foundations for Columns Use SOG to support 1FL walls
14
CONCRETE FRAMING OPTIONS
Girder: 1200x700, 1000x700 Slab: 270mm Girder: 700x700 Beam: 500x700 Slab: 200mm Flat Slab: 250mm SECONDARY BEAMS POST TENSION SLAB 2-WAY SLAB
15
CONCRETE FRAMING OPTIONS
Deflection: 45mm Deflection: 44mm Deflection: 42mm SECONDARY BEAMS POST TENSION SLAB 2-WAY SLAB
16
CONCRETE FRAMING OPTIONS
Bigger size Heavier Lighter More beams More formworks Least formwork More complicate May be slower Expensive Materials SECONDARY BEAMS POST TENSION SLAB 2-WAY SLAB
17
COMPARE FRAMING OPTIONS
Roughly estimate For 891m2 floor Category 2-way slab Secondary beams Post-tension Flat slab Unit Slab Concrete Quantity 240.57 178.2 222.75 m3 Price 628.85 465.81 735.08 Mil. VND Rebar 13995 15489 7970 kg 349.88 387.23 199.25 Formwork 734.4 765.6 891 m2 113.10 117.90 137.21 Beams 89.88 289.73 234.95 20662 17164 516.55 429.10 506.66 76.86 86.13 Tendon 11480 855.69 Total price Total unit price 2.22 1.93 2.16 Mil. VND/m2 → SELECT Slab with secondary beams
18
Compare to COMPOSITE STRUCTURE
Composite Steel Deck slab Columns can be steel Price ≈2 mil.VND/m2 (excluded Fire protection) * Based on quotation of the contractor Reduce load More complicate, Slower
19
SPAN LENGTH Efficient span: 2x9m = 18m
Create enough space for 1FL Mart Use Continuous Steel roof girder
20
STEEL STRUCTURE STEEL GIRDER span 18m Fast, Easy for construct
21
STEEL STRUCTURE SPACE FRAME FLAT TRUSS Complex, Slow down construction
Only suitable for large span, 54m eg.
22
PURLIN STRUCTURE Cold-form Z, C profiles
Suitable for column pitch 6-7m Select Hot rolled I profiles To support wind loads in large span 11m
23
POLE SIGN STRUCTURE Steel Hollow column for Pole
Small steel shape truss for Sign
24
EXPANSION JOINTS IN R.C SLAB
Double the columns 2 cols 1 pile cap PROPOSED LAYOUT
25
DESIGN CODES US. Codes for structural design Compatible with Korean standard Concrete: ACI Steel: AISC LRFD Wind load: ASCE 7-05 Seismic load: UBC 97 Load combinations: UBC 97
26
LIVE LOAD 1st Floor SDL: Superimposed Dead load
LL: Live load (by Code)
27
LIVE LOAD 2nd Floor SDL: Superimposed Dead load
LL: Live load (by code)
28
WIND LOAD Code: ASCE 7-05
29
SEISMIC LOAD Code: UBC 97
30
RFI to Client Live loads on Mart Client to confirm use US code with Authorities