Diagnostics for XPR CNAO BD Group Pavia, 17 marzo 2015 1
2
Diagnostics To-do-list for XPR
2 profile monitors on the beam line (SFP); 1 profile monitor (SFP) without tank and without IN/OUT for the isocenter; 1 qualification monitor (QPP). Pag. 2 9/set/2014 Diagnostica per la linea sperimentale
3
Diagnostica per la linea sperimentale
Diagnostics for XPR Realization of prototype (done). Calibration test with radioactive source (done) Automatic calibration software (beta version done) Production of the fibers and metalization (in progress BD group -- AXE and TSD). QPP study and design (in progress) Pag. 3 9/set/2014 Diagnostica per la linea sperimentale
4
Schedule Table BD is ON TIME No Subject Date (weeks) 1
INFN order sent to AXE for transporting the 24 tools (jigs) from AXE to TSD using their own transport team This transport order refers to one go to TSD and return to AXE the same day and, later on, in a second go to TSD and return to AXE the same day. To=27/02/2015 2 INFN order to TSD for metallizing the 24 jigs or tools is sent. 3 Transport of the 24 tools from AXE to TSD, according to AXE To+1=09/03/2015 4 CNAO order sent to a transport company “X” for transporting the metallized fibers and other items from AXE to CNAO-Pavia To+2 5 Fibers metallization end at TSD To+5 ---- ----- ------ 17 Lanzavecchia and J.Bosser visit of one week to SCM. The fibers layers are assembled on their frames by SCM technicians in the clean room. Fiber ends polishing. Preliminary conclusions To+22 18 Transport of the production from SCM to CNAO by the transport company Y. To+23 19 Calibration at CNAO. Final acceptation or refusal (partial or global) T0+24 and 25 BD is ON TIME