1 Public Works Department
2013

2 Public Works Team Ken Chalker, Director
Lannie Towe, Public Works Coordinator Sheila Renfroe, Administrative Specialist Michael Sams, Crew Leader Michael Montgomery, Crew Leader Justin Crowe, Crew Leader Brad Campbell, Crew Leader George Stewart, CDL Driver, Mechanic Jeff Hammond, CDL Driver, Mechanic James Moore, CDL Driver Paul Maddox, CDL Driver Daniel Shields, Laborer Howard Anderson, Laborer Steven King, Laborer Henry Gallups, Laborer Dwayne Gilleland, Laborer

3 Public Works Team

4 City of Winder Billboard Sign
Before After

5 City of Winder Billboard Sign
Before After

6 Community Center Public Works Department first leveled the front of the Community Center before laying sod.

7 Community Center

8 Community Center- Working together as a team!

9 Jug Tavern Park Before After

10 Jug Tavern Park Before After

11 Jug Tavern Park Before After

12 83 East Candler Street Before seeding After seeding

13 83 East Candler Street Before and after grass has grown

14 83 East Candler Street Hydroseeding

15 83 East Candler Street The new grass

16 Exchange Boulevard - Before
This area was full of bushes, trees and shrubs.

17 Exchange Boulevard- After
Two days later, most of it was cleared out.

18 Lakeshore Drive *Notice how narrow the road becomes from all the overgrowth.

19 Lakeshore Drive *After the overgrowth was cleared, this street sign became visible again.

20 Lakeshore Drive- Brush Truck

21 Lakeshore Drive Before

22 Lakeshore Drive After

23 Lakeshore Drive Cody Skelton and Brad Campbell cutting down tree limbs and trimming.

24 Winder Brush Truck James Moore cleaning up debris.

25 Winder Brush Truck

26 Theater Alley Before After Michael Sams packing the rock.
Dwayne Gilleland and Michael Sams packing the rock.

27 Installed river rock to the edging of the walkway.
Theater Alley

28 Landscaping added to the walkway.
Theater Alley Landscaping added to the walkway.

29 Theater Alley Dwayne Gilleland and Brad Campbell Working on the sidewalk.

30 Public Works Leaf Truck
Capital Avenue

31 Public Works Leaf Truck
Henry Gallups vacuuming leaves off Capital Avenue.

32 Cultural Arts Building- Front
Before After

33 Community Center Decorating for Christmas

34 Winder City Hall The Public Works Department helped decorate the new City Hall for Christmas! They added banners, garland and wreathes to the exterior of the building.

35 Winder Fire Department

36 Winder Fire Department
Daniel Shields and Mike Montgomery cleaning up an old fence that had to be torn down.

37 Cedar Bluff curb repair work

38 Cedar Bluff curb repair work.
Patched holes and repaired curb. Road paving will take place soon to finish the project.