1 Strategy for Successfully Drilling and Completing Wells on a Multi-Well Pad Alan Vasicek Apache Corporation

2 Alan Vasicek Bio Introduction Apache Corporation
Worldwide Drilling – Houston, TX Global Directional Drilling Advisor DD Manager, DDC, Sr DD, M/LWD, Multi-laterals – 34 yrs BS Petroleum Engineering, University of Texas Strong driver of drilling optimization, performance improvement, new technology and applying engineering principles to directional drilling ConocoPhillips Ekofisk/Eldfisk offshore Norway project with extensive anti-collision work

3 MultiWell Pad Challenges
Old vertical wells w/poor or no surveys Existing and future surface facilities Existing pipelines On-Lease pads and Off-Lease pads Offset operators drilling and completions activities – current and future Limitations on directional work for production – max doglegs, max inclination and still get wellbore displacement How many wells on a lease? On each pad? Just everyday Permian drilling challenges – losses, water flows w/H2S, target TVD changes

4 Arial footage for Lynch A HZ (Wildfire) acreage

5 Lease lines and pipelines overlaid
Red: Pipeline Pink: Section Line

6 First and last take points are acquired from Geology
Red: Pipeline Pink: Section Line

7 First iteration - Does not take into account future wells, facilities or additional surface hazards

8 Planning Workflow for Consecutive Iterations
High definition drone footage is added to find additional surface hazards Collaborative work w/ facilities, completions, etc… for optimal location placement FTP and LTP from Geology Drilling determines surface location Future possible wells (2 – 3 years out) added to well planning scenario Wolfcamp pad locations moved farther south to avoid collision issues and cost w/ future Spraberry wells Planning time reduced significantly

9 Lynch SHL Proposal Latest Iteration
Original Plan for Facilities Line Discoverable Pipeline Discoverable Pipeline Facilities Reroute to Accommodate Future Spraberry Pad Lynch SHL Proposal Latest Iteration Lynch A HZ Wells (Rectangular Targets) Pad 1: #30HM, #31HM, #32HM Pad 2: #33HM,#34HM, #35HM, #36HM Pad 3: #37HM, #38HS, #39HS Pads 4, 5, 6: 12 future Spraberry wells (Yellow and White Circle Targets) Red: Pipeline, Pink: Section Line, Gold: Facilities

10 Opposing Laterals with offset operator Potential 28 wells in half section
Apache Pads to North Drilling South Apache FTP’s Offset FTP’s Offset Pads to South Drilling North

11 Opposing Laterals with Offset Operator

12 Anti-Collision Control
Three target zones combined with opposing curve wellbores (from offset operator) causes potential anti-collision and space issues Opposite side wellbores must “wrap” around opposing wellbores to drill in same vertical plane Have a detailed Anti-Collision and Survey policy Ensure everyone understands and abides by policy – field and office staff, operator and DD service company Be aware of SF and EOU for survey tools – tighten EOU’s if needed “Drill the Line” – one drifting well bore off course can have serious consequences!!!

13 In-Field Referencing Results