Download presentation
Presentation is loading. Please wait.
1
Drainage Challenges The need for LoDEG
Owen Davies Sustainability Engineer Environmental Services & Highways 21st November 2011
2
Introduction
3
What is London at risk from?
Coastal Fluvial Pluvial Groundwater Reservoir Sewer Human EA LA TW TW (generally)
4
Pluvial Flooding Hampshire 2000 Boscastle 2004 Leeds 2007 Cumbria 2009
Bournemouth 2011 “There has been an instance of serious Surface water flooding every month in the UK since June 2007”
5
Groundwater Flooding Water table rising
No industry Natural Spring lines/resurgence points Peckham spring Geology Clay
6
Worked Example
7
Lambeth Pluvial Risk (1:100+CC)
8
Historical Rivers
9
Historical Flooding
10
Sewer Network
11
So what is the Problem? 1:15 design standard too low for a modern city? Combined sewer Has it encouraged a “Three Monkey” approach?
12
Anything else? Loss of front gardens? Did we ever need grass verges?
Traffic calming? Enforcement? Efficiencies? Design?
13
Nothing else then? “I am informed that the flooding has been the same for the past eight to ten years in times of sudden and heavy rainfall. If you have any suggestions to offer as to dealing with the trouble I shall presume to hear from you in due course“ Mr Fitzmaurice, LCC to Borough Engineer 29th August 1911
14
What we Know (Lambeth) Not a case of if but when
49,813 properties at risk (3-10cm) = 37% of the entire housing in Lambeth. Insurance cost at 2007 prices of £1.2bn Does not include asset or EP costs (Roads £83m) The areas at risk from Surface/ground Water flooding The areas Lambeth controls/influences
15
What we Know (Lambeth) Cont…
19% or 22,976 increase in housing stock 9.8m/l a day increase in potable water use 159m/l a day increase in sewage (not including surface water) Population growth to exceed 300k
16
Who can we blame? Thames Water? TfL? Housing? Education?
Environment Agency? Defra? Victorians? Planners? History?
17
Challenges Understanding pluvial flooding Understanding Groundwater
Understanding resources Understanding infrastructure & Assets Understanding responsibilities Understanding funding Understanding ownership
18
What do we understand? Pfra’s SWMP’s Hazard mapping CDA’s Assets
19
Solutions SUD’s Green Infrastructure (GI) Blue Corridors Design
Maintenance Enforcement LoDEG
20
LoDEG 19 Boroughs responded + TfL & London Councils 60% response rate
Q1 100% in favour of LoDEG Q2 90% in favour of meeting quarterly Q5 100% in favour of training
21
Areas of concern Resource/Funding = 25% Asset = 15% SUD’s = 15%
SAB = 8% Communications = 8% Flood Risk Plans = 7% Water companies = 2%
22
What will - is happening
First Full Meeting 30th November 2011 2 Seats on TAG Coastal & Fluvial Committee Representation on ATDA Representation on LoTAMB Seeking acceptance to LoTAG 8th December 2011
23
Conclusion We are all in this together
We cant control when it will happen We can control it’s affects and influence
24
Owen Davies Sustainability Engineer Environmental Services & Highways
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.