ELENA – Vacuum chambers and vacuum activities

Similar presentations


Presentation on theme: "ELENA – Vacuum chambers and vacuum activities"— Presentation transcript:

1 ELENA – Vacuum chambers and vacuum activities
IIC meeting G. Riddone (contribution from G. Bregliozzi, R. Kersevan, A. Mongelluzzo, A. Sapountzis, A. Sinturel. M. Thiebert)

2 Vacuum chamber productions
EN-MME LNR Dipole vacuum chambers LNI Y-vacuum chamber LNI quadrupole vacuum chambers LNI dipole vacuum chambers LNR inj-ejection vacuum chambers LNS: AD_VCPAB AD_VCPAC0001 Trinos All other straight chambers for LNR, LNE00, LNE50, LNI and LNS To be noticed that 4 LNE50 chambers need management green light before launching the production (EN-MME or Trinos): VCDCU/CX/CW/CV Details available at

3 Liste chambres fabrication Atelier Principal (le 9/06/2016)
Production by EN-MME VCKYA Liste chambres fabrication Atelier Principal (le 9/06/2016) Réf Ligne N0 Terminée Etuvage NEG Installée AD_VCQAS LNI 1 O N AD_VCQBT AD_VCQBU En cours d'installation AD_VCQBV AD_VCBYG AD_VCBCM AD_VCPAD AD_VCBCJ (K) LNR Installation 2 Bat 113, RGA 3 Bat 113 4 Bat 181 5 6 S18 Bat 113 , montage étuvage AD_VCBCJ 7 Reserve SMA18 AD_VCBYE Bat 181, dépôt NEG AD_VCKYA O(S17) Fin Test Hé à transporter 181 AD_VCDBT LNE00 AD_VCDCQ AD_VCDCR O(S22) AD_VCPAB LNS S26 AP en cours de fabrication AD_VCPAC Except for the two LNS chambers (fabrication:end of June 2016) the production of all the other chambers is completed

4 Production by Trinos 1st batch x12 AD_VCDBS0001 x1 AD_VCDCG0001 x2 AD_VCPIB0001 x1 AD_VCXBA0001 x2 AD_VCLBA0001 x2 AD_VCPQA0001 x1 AD_VCXBB0001 x1 AD_VCXAA0001 x1 AD_VCQBK0001 x1 2nd batch x8 AD_VCDCE0001 x1 AD_VCDCF0001 x1 AD_VCQAP0001 x2 AD_VCQBJ0001 x2 AD_VCDME0001 x1 AD_VCDBQ0001 x1 3rd batch x13 AD_VCDCI0001 x1 AD_VCDBU0001 x1 AD_VCDBV0001 x1 AD_VCDBW0001 x1 AD_VCDBY0001 x1 AD_VCDBZ0001 x AD_VCDCS0001 x1 AD_VCDDB0001 x1 AD_VCDBR0001 x1 AD_VCPAA0001 x1 AD_VCDBX0001 x1 AD_VCSPB0001 x1 AD_VCSPA0001 x1 NEG done He test and cleaning done NEG done DAI under approval, shipment basic material W24 4th batch x6 VC upstream and downstream the fast valves

5 Production by Trinos He test (80%) NEG coating (batch 3 no NEG)
Acceptance test (1 per batch) Batch 1 Batch 2

6 Acceptance test (1 per batch)
Production by Trinos He test (80-100%) NEG coating Acceptance test (1 per batch) Batch 3 (No NEG)

7 Bake-out equipment LNR dipole Kickers
Jackets are installed on all the chambers Kickers Jackets are installed BPM and other chambers in the magnets Wrapping according to magnet availability Standard elements Ion pumps, gauges, chambers: wrapping on-site after vacuum tests

8 NEG coating LNR dipole vacuum chambers Scraper bellows:
#1: LNR dipole chamber # 1 (NEG completed) was installed with supports on two dipole magnets to check availability space between coils and bake out jackets. #2: NEG coating done, masked bellows and sleeves, no peel off, transport to B113 for acceptance tests #3: NEG coating in W23 #4 to 6 : NEG coating will follow W24, 25 and 26 Scraper bellows: 1 bellows with NEG successfully tested (no peel-off) 1 bellows NEG W23 LNR chambers TRINOS RUN #2 successfully coated, no peel-off at bellows or welding RUN #3 (Week 23) Y-chambers x3: NEG coating W24 to W26

9 NEG coating PU SCHOTTKY (Responsible Jorge Sanchez Quesada)
4 chambers received (weight ~80 kilos each, very fragile) Optical inspection of the 4 chambers have dust, projections, metallic shavings, oxidation, scratches and white spots. Proposed actions-> to be discussed BPM for Tune (Responsible: Joel Albertone) After the acceptance test there is peel-off (dust-like). The electrodes were coated in another lab than the vacuum tanks. Unable to confirm by eye if the peel-off is coming from the chamber only or/and the electrodes Proposed actions-> to be discussed Try to detect Ti,Zr,V on the vacuum chamber with a portable XRF If there is NEG on the chamber, manufacture new electrodes If there is no NEG on the chamber, in addition the electrodes, strip the NEG from the chamber (if possible) and/or manufacture new chambers.

10 Acceptance tests See also SP site: Underway BTV tank with NEG Kicker tank with extra pumps: 1 Capacitorr D2000, 1 Capacitorr D3500, In the pipeline Y- Chambers (2+1): available for testing end of June, W27 LNR dipole chambers: 1 chamber per week W24 to 29. SEM chambers: assembly to be tested with vacuum chambers W24-25 one vacuum chamber alone after cleaning to be tested W23-24 Trinos vacuum chambers: set#2 with NEG W23 (1 chamber only will be tested) set#3 with NEG W24 (1 chamber only will be tested)

11 Installation Focused on the sector LNI-LNE and LNR
40, 45% of the installation of those sectors is done. We wait for survey team to align the dipoles to continue the installation in LNR 40. We wait for EN-MME to re-machine the support plate of the LNI.ZQNA.0050 to connect last part of LNI. We wait for one more SEM tank to complete sector valve installation in LNE00.