Download presentation
Presentation is loading. Please wait.
Published byPhilip Thornton Modified over 6 years ago
1
OSIRIS Full Team Meeting Welcome, Introduction, Logistics
Holger Sierks Max-Planck-Institut für Sonnensystemforschung
2
OSIRIS - Scientific Camera System
NAC – Narrow Angle Camera FOV 2.2°, IFOV 18.6 µrad/px SiC, 2k x 2k BI E2V CCD, AB 3-mirror off-axis, f/8, 717mm WAC – Wide Angle Camera FOV 12°, IFOV 101 µrad/px Al bench, 2k x 2k BI E2V CCD, AB 2-mirror off-axis, f/5.6, 140mm plus 3 E-Boxes (35.6 kg total) 22 % of Rosetta p/l
3
Overview OSIRIS: 15.5 months of prime mission by now in operation
6 months to end of nominal mission (at 2 AU outbound), mission 9 months extended OSIRIS is healthy and in good shape (fingers crossed) Statistics: NAC images, WAC images taken since 20 March 2014 Door cycles per camera: NAC 3.040, WAC 4.050 door open time: NAC total of 5 days 11:22h; WAC total of 12 days 02:10h Filter-wheel moves to date: NAC , WAC (filter-to-filter changes) OSIRIS cameras are at 2/3 of the lifetime usage (wrt consumables) 3 Science papers, 18+ A&A papers, 1+1 Nature paper, working A&A wave 2 Intensify x-team interaction on science planning, campaigns, & science data analysis Need to go close for detection and monitoring of surface changes, link to activity Issues: NAC curtains, WAC shut down, memory overruns, doors, filter wheel WAC Need to find out about dust on mirrors! Calibration issues: stray light infield, out-of-field, deconvolution algorithm worked Team at its limits on planning and data verification
4
Technical Issues Open NCRs:
#229 NAC CRB HK out of limits for one short phase #230 OSIRIS requested LCL off by PCM HK limit violation #231 WAC door failure in closing (2 by now) #232 NAC door failure in closing #233 WAC Filter Wheel #1 position readout and / shutters NAC & WAC (parameter/performance tunes) / memory overruns (o/b software issue on compression, queuing)
5
NAC Curtains February and May 2015: Total of 36 images
6
WAC Unlocking Errors > 500 errors in April/May (STP ), -> 1 week shut down
7
Logistics Meeting is 2.5 days
Team dinner: Reservation in Sambesi on Wednesday at 20:00 (Dutch treat) Support: Fee von Saltzwedel, ext. 267 Note Rosetta SWT # September MPS
8
SWT #42 @ MPS Göttingen 14-18 September 2015
9
Backup
10
Lifetime Limits shutter doors filter wheels
qualification: activations good for activation in flight doors qualification: cycles good for door cycles in flight filter wheels qualification: filter to filter moves good for filter to filter moves in flight
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.