Dissemination Activities Report
WP7 Task 7.4 Dissemination Activities Report
2
Task Progress / Main Achievements
Indicators for the Reporting Period (based on DoW and Dissemination Plan) At least 4 INERTIA-related scientific publications At least 4 presentations about INERTIA project Establish contacts with EEB DATA MODELS COLLABORATION SPACE which will be used as a dissemination channel regarding the achievements of the INERTIA Set first contacts with 2 additional European projects (GYSER Project, BEMS NL) Participation in at least 2 international thematic events (HYPERTECH, ETC EL) Participation in at least 1 national event per partner country (Greece (??), Italy, Sweden, Netherlands, Spain, Slovakia) Maintain contacts with previously contacted entities through Living Lab At least 2 specialized demonstration activities at thematic events At least 1 larger demonstration/exhibition at a general ICT event
3
Task Progress / Main Achievements
Continuous dissemination of main project results Delivery of the 4th project Newsletter End of September Dissemination Material for pilot premises already available Participation on main events (2nd year Reporting Period): European Smart grids Summit (ETC EL) “Beyond a Sustainable Energy System” (ETC EL) “Smartgrids in Europe” – Greece (HYPERTECH) Workshop with Italian Energy Stakeholders (ENG) Demo Application Supporting Smart Grid Control (TUK) Publications (2nd year Period): HYPERTECH Behave Conference - September 2014 HYPERTECH Med Power IEEE 2014 Accepted Paper TUK, HYPERTECH Med Power IEEE Accepted Paper ENG “Cyber Physical Systems give Life to the Internet of Energy”
4
Allocation of work among partners
Expected contributions from partners Further events , workshops in order to further disseminate project results Extra publications, participation on main events
5
Deliverable Status of Deliverable Contributions expected per partners
Work on the deliverable in progress Reporting the main dissemination activities of the project (M24) Contributions expected per partners Reporting of dissemination activities Planning for intermediate – peer review version A final version of the deliverable will be provided reporting all the dissemination activities.
6
Planning for next efforts
Planning of efforts for remaining period towards Task completion/deliverables submitted on M24 (September) Report on the main dissemination activities of the project Circulate the deliverable by mid-September