Operations KM3Net/Fr J. Brunner 13/02/17
2
Old DU1 Studies Dark room CPPM open BOB @ DOM1
Alex, Sylvain, Peter & DOM6
3
Old DU1 Studies Situation: several DOMs (1,2,6,12) do occasionally not boot after having been powered for some time Origin : these DOMs are not powered power spike after 20msec shutdown BOB DOM 6 opened, various tests BOBs of DOM 1,2,6,12 also opened Now everything works , i.e. impossible to reproduce non-boot condition
4
White Rabbit switches Spring 2016 : no bridge any more, GPS directly connected to GM broadcast switch Very rare boots needed Problems after boot (Aug 2016, Jan 2017) No PTP packets on broadcast port 18 Solved by adding a 5sec delay into startup script before disabling auto-negotiating for port 18 (wr17)
5
KM3Net power station La Seyne
Electrical standardization of power station 02/02/2017 Replacement of the switch-disconnector INV400 located in the Power Hut ANTARES by an NSX400F circuit-breaker. Replacement of the NSX400F circuit breaker located in the MEUST power station by a switch-disconnector NSX400NA. Connection of the KM3NeT emergency stop on the switch-disconnector NSX400NA. Maintenance of air condition system in power hut
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.