1 Agenda 2015 Installers Meeting
2015 Report Cost Comparison NPDES systems System Design Site Drainage Operation and Maintenance Septic Haulers Web sites Cindy Brookes

2 Seneca County Report

3

4

5

6

7 14 Causing Public Health Nuisance
2014 2015 90 29 1120 16.8 19 99 2420 32.6 5.8 4 0.3 33 25 4.43 170 87 18.7 42 54 1987 10.2 96 41.2 100 55.1 56 34 25.1 45 40 57.9 140 13 0.36 19.6 20 12 9.47 47 31.4 84 39.6 14 14.3 9.6 8 51.3 18 4.38 1554 9.55 79 31 18.6 66 78 15 0.77 49 0.74 534 21 3 0.91 35 326 1.14 9 1 1.19 210 94 0.13 1.99 0.05 276 0.22 6.8 0.14 7.4 55 16 366 0.59 0.23 2.79 41 64 13.8 0.42 2014 NPDES Results 35 Systems tested 14 Causing Public Health Nuisance 2015 NPDES Results 37 Systems tested 28 Causing Public Health Nuisance

8 2015 NPDES System If at all possible will add soil absorption after system.

9 2015 System Design Seneca county PSWT=12” and in situ soil=8”
New rules allow many more options for Replacement systems (B)(5)- Provide app. Installation and operation costs of feasible STS options to assist the owner in selection of the STS design. Example 1- SICL Grade 2 PSWT= 10” .4/.6 and 2.4 HLLR Option 1- ATU w/chambers 360/.6= 600x1.25= 750 ft2 360/2.4= 150x.80= 120ft 2 ft trench 3 runs at 124ft (Field 14 ft wide) 3 ft trench 2 runs at 124ft (Field 10 ft wide) sand fill

10 2015 System Design Example 1- SICL Grade 2 PSWT= 10” .4/.6 and 2.4 HLLR Option 2- LPP w/ chambers 360/.4= 900 x 0.75=675 ft2 360/2.4= 150x 0.70= 105ft 2 ft trench 3 runs at 112ft (Field 14ft wide) 3 ft trench 2 runs at 112ft (Field 10ft wide) sand fill 3 ft trench with 3 zones- 3 runs at 76ft (Field 15 ft wide) Option 3- Engineered Drainage w/leachfield= PSWT= 16” 360/.4= 900x1.25= 1125 w/ chambers= 844 ft2 360/2.4= 150x 0.80= 120 ft. long Blount soils= Drain 4.6 ft deep spaced 22 ft apart

11 2015 45 ft 128 ft

12 2015 Site Drainage – 3701-29-16 Engineered drainage
Utilizes soil types to develop drain spacing and drain depth to achieve desired PSWT. OSU used Drainmod to simulate 66 soil types Drainage 6ft from up slope and 8ft remaining Max 2” into restrictive layer as determined in soil evaluation. Pipe 4” slotted Slope at least 0.10 per 100ft. Min. of 10” stone and trench width not specified. Lift station can be used if fall not available.

13 2015 Operation and Maintenance
All homeowners are required to purchase operational permit when purchasing an installation permit. New fee for $125 for all Operational permit and is good for 5 years. Service contracts required on NPDES and ATU (I)(2) Registered service providers are required when system is utilizing depth credits (Mounds, LPP, Engineered drainage). Homeowners can only do inspections on gravity leachfields without becoming a registered service provider. If using ATU service provider must do service on entire system

14

15

16 2015 Septic Haulers Will not have inspection day at Fairgrounds. Instead setup time and days on individual basis. Will accept truck inspections from other counties Ensure the Pumping Report is filled out completely. Turn in reports no later than 2nd week of following month If pumping is required by SCGHD we need pumping report regardless if tank is pumped or not.

17 2015 Review websites www.senecahealthdept.org