Download presentation
Presentation is loading. Please wait.
Published byBaldric Ryan Modified over 6 years ago
1
Florida Weatherization Assistance Program Reporting & Information Management eGrants & GAS
Norm Gempel, Manager Florida Department of Community Affairs 2007 National Training Conference December 2007
2
The eGrants System Online Data Processing System
Electronic BWR and FSR Electronic Quarterly WAP-LH Reporting All agencies are “on-line” Major components have been completed.
4
The eGrants Process Login Select Program Select Contract
Enter Job Number Enter BWR Information Close BWR(s) Edit FSR (do not edit until ALL BWRs are closed) Submit FSR Fax Signed FSR to Your Consultant
5
eGrants Login www.dca.state.fl.us/fhcd/egrants/login.cfm
Enter username and password. Contact your consultant at regarding assignment or modification of your username and password.
6
Social Security Number (SSN) Check allows agency intake staff to check applicants against the entire statewide data base of previous Weatherization clients.
7
eGrants - Desktop Then, Click on Contract Number to Select.
First, Select Program. FSR Listing and Current Month BWR’s Reflect Selected Contract Number. Client Name Client Name
8
eGrants – FSR Listing Each Contract has a FSR Listing
Subgrantee Name and FEID Number Click to display the selected contracts FSR Listing. Contract Number Each Contract has a FSR Listing This listing will reflect the status of requests for payment and payments made/approved during the contract period.
9
FSR Listing, continued Creating an FSR with No BWRs Click Click
Subgrantee Name and FEID Number Contract Number Click Click Creating an FSR with No BWRs The reporting period for FSR’s is monthly. Subgrantees must submit an FSR by the tenth day of the month following the reporting period. For reporting periods with no units completed (no BWR’s), subgrantees will submit an FSR with a zero payment request.
10
eGrants - FSR for No BWR’s
Click Subgrantee Name Sugrantee Address Contract Number
11
FSR for No BWR’s, continued
No BWR FSR: Do not enter/report expenditures. First, enter name, title and date of authorized signature. Then, click Save/Next. Failure to click on the Save/Next button will result in the loss of data entered.
12
Printing a single page FSR
13
FSR for No BWR’s, continued
Click here to return to the FSR Listing page. Subgrantee Name Sugrantee Address Contract Number
14
eGrants – Submitting an FSR
Subgrantee Name and FEID Number Program Contract Number Click here to submit the FSR to your consultant for processing. Click here to submit the FSR to your consultant for processing. Click here to submit the FSR to your consultant for processing.
15
Submitting an FSR, continued
Subgrantee Name and FEID Number Program Contract Number Click OK.
16
Submitting an FSR, continued
Subgrantee Name and FEID Number Program Contract Number Your FSR has been submitted for payment processing.
17
eGrants - Desktop After selecting the Program and Contract Number, click on BWR Listing to review and enter BWRs. Subgrantee Name and FEID Number Program Contract Number Sub grantee Username Client Name Client Name
18
eGrants - BWR Listing Viewing BWRs
Subgrantee Name and FEID Number Program Contract Number Viewing BWRs A BWR Listing is compiled as BWRs are created. When all BWRs are complete, each BWR is closed to create your monthly FSR. Each FSR’s corresponding BWR Listing may be viewed by first viewing the FSR and then clicking on the “View BWR Listing” button.
19
eGrants – Creating BWRs
Subgrantee Name and FEID Number Contract Number First, Enter Job Number Then, Click on Create new BWR Assigning Job Numbers Use at least eight characters 2 for program year = 05 2 for program = WX or LH 2 for County 2 for unit number = 01, 02, 03 Use first assigned job number for all programs = 05WXAL01
20
eGrants – Client Intake Form
Subgrantee Name and FEID Number Contract Number This has been updated and only requires the last four digits. Then, click on Search by SSN
21
eGrants – Search by SSN Contract Number Subgrantee Name, FEID and Contract Number 04WX-4Y W.X. Client A Street Click here to pre-fill the Client Intake Form with this client’s information. A contract number, client name and unit address will be listed if services had been provided to this SSN under another program or in a prior program year. If the client listed is eligible for additional services (10 year rule), click on the client’s name. Information related to the prior client record will pre-fill the BWR. Review the record for completeness and current accuracy.
22
Search by SSN continued
Contract Number Subgrantee Name, FEID and Contract Number Click If no record is retrieved, click on the Back button to return to the Client Intake Form for data entry.
23
Client Intake Form, continued
Subgrantee Name BWR Weatherization Contract Number After entering/reviewing data in all fields, click on the Save/Next button. Failure to click on the Save/Next button will result in the loss of data entered/updated.
24
eGrants – Client Intake Form, Part II
Subgrantee Name Subgrantee Name BWR Weatherization Contract Number Contract Number First, enter annual income. After entering data in all fields, click on the Save button. Then, click on Save/Next.
25
eGrants – Household Information
Subgrantee Name Contract Number Subgrantee Name BWR Weatherization Save/Next.
26
Household Information, continued
Total All household residents Verify income eligibility People in House All characteristics Units by Occupancy Client only All characteristics (of client, ie Elderly and Handicapped) Units by Type Choose one
27
eGrants – Required Measures
Subgrantee Name BWR Weatherization Contract Number Use the Comments Field to address required measures with no costs. See Section Two of the WAP Manual for required comments. After addressing all required measures, click on the Save/Next button.
28
eGrants – Infiltration Reduction Measures
Subgrantee Name Subgrantee Name BWR Weatherization Contract Number Contract Number Infiltration Reduction Costs are limited by the data provided by the NEAT/MHEA Output report. See Section Two of the WAP Manual for Output Report analysis guidelines.. After entering costs, click on the Save/Next button.
29
eGrants – Weatherization Measures
Subgrantee Name BWR Weatherization Contract Number Weatherization Measures Costs are limited by the data provided by the NEAT/MHEA Output report. See Section Two of the WAP Manual for Output Report analysis guidelines. Incidental Repair Costs are limited to $600 and must be related to infiltration measures. Click
30
eGrants – Readings First, enter annual income.
Subgrantee Name Subgrantee Name BWR Weatherization Contract Number Contract Number First, enter annual income. After entering data in all fields, click on the Save button. Then, click on Save/Next.
31
eGrants – BWR Listing First, enter annual income. Subgrantee Name
BWR Weatherization Contract Number Contract Number First, enter annual income.
32
eGrants – Close BWR and Create FSR
Subgrantee Name Subgrantee Name BWR Weatherization Contract Number Contract Number First, enter annual income. After entering data in all fields, click on the Save button. Then, click on Save/Next.
33
eGrants – Edit FSR After entering data in all fields, click on the Save button.
34
eGrants – Edit FSR, continued
35
eGrants – Edit FSR, continued
36
eGrants – Edit FSR, continued
39
eGrants – Submit FSR
40
eGrants – Submit FSR, continued
41
eGrants – DCA Receives FSR
42
eGrants – DCA Receives FSR continued
43
eGrants – FSR Re-submitted
44
eGrants Call Your Consultant for a Username and Password
Call Your Consultant whenever you encounter problems Use eGrants for All Programs WAP WAP-LIHEAP CSBG LIHEAP
45
Future Plans for eGrants:
Combining Contracts Semi-Annual Reports Electronic Signatures
46
Grants Administration System
47
PENDING REIMBURSEMENT REQUESTS
This screen represents the firewall protecting our system. Local agency submissions are reviewed from this screen, and only when they are correct is the data allowed into the Grants Administration System.
48
Submitted FSR
49
JOBS
50
CLIENT INFO
51
Allows state staff to check agency requests against database of all state Weatherization recipients.
59
Request Approved & Accepted
60
SUBGRANTEE LISTING
61
CONTRACT DETAIL
68
Data Stored in GAS
80
To revisit stored data
92
Reports
132
Future items: Combining Contracts Electronic Signature
“STOP” – missing data Measures reports
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.