Presentation is loading. Please wait.

Presentation is loading. Please wait.

PANDA collaboration meeting FEE session

Similar presentations


Presentation on theme: "PANDA collaboration meeting FEE session"— Presentation transcript:

1 PANDA collaboration meeting FEE session
Communications EMC meeting EMC group assigned Myroslav Kravtsyuk as responsible for EMC readout electronics Work Packages for development of EMC readout defined Many packages got responsible institutes Other detector groups should define work packages and assign responsible institutes - can be discussed in Rauischholzhausen MVD group triggered discussion about GBT usage in PANDA Meeting with CERN Microelectronic group on March 4-th FE/TDAQ workshop in Rauischholzhausen April 14-17 Registration for the workshop: March 9-th 2010 PANDA collaboration meeting FEE session

2 PANDA collaboration meeting FEE session
Motivation Some PANDA detectors and readout circuits will be exposed to high particle flux MVD Planar GEM TPC (?) EMC (?) MVD group, lacking manpower, looks for a ready to use solution for high speed optical link Possible solution: GBT – Radiation hard high speed optical link March 9-th 2010 PANDA collaboration meeting FEE session

3 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

4 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

5 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

6 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

7 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

8 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

9 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

10 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

11 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

12 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

13 Usage of FPGA resources
March 9-th 2010 PANDA collaboration meeting FEE session

14 PANDA collaboration meeting FEE session
March 9-th 2010 PANDA collaboration meeting FEE session

15 DAQ Architecture GBT SODA functions:
provision of absolute time- common clock synchronization with beam structure data flow control (throttling) GBT Detector Frontends Data Concentrator First Stage Super burst Builder Second Stage Super burst Builder Compute Nodes SODA DAQ : Beam structure : 2 us burst ns pause Super burst : 500 us Data block corresponds to one burst Superblock corresponds to 500 us beam DAQ builds super bursts by Round Robin algorithm 200 GB/s sustained data rate March 9-th 2010 PANDA collaboration meeting FEE session

16 PANDA collaboration meeting FEE session
GBT and PANDA GBT - interface between Data Concentrator and FEE compatibility with SODA ? GBT frequency 160MHz but it can run with MHz ….. compatibility with FEE GBT implementation requires significant hardware resources POWER, FPGA Even having VHDL code porting to particular FPGA and maintenance of code to be considered GBT to be used only for FEE where commercial components can not be used -> two types of serial link protocols between FEE and Data Concentrator -> GBT based Data Concentrator module March 9-th 2010 PANDA collaboration meeting FEE session

17 PANDA collaboration meeting FEE session
To do list Verify compatibility with SODA - Igor Verify compatibility with FEE - MVD group Assign responsibility for Data Concentrator module development Check if any other detector groups interested in RadHard optical links Check for alternative radiation hard serial links March 9-th 2010 PANDA collaboration meeting FEE session


Download ppt "PANDA collaboration meeting FEE session"

Similar presentations


Ads by Google