Download presentation
Presentation is loading. Please wait.
1
WEST RAND DISTRICT MUNICIPALITY
GAUTENG REGIONAL WORK SESSION FOR DEVELOPING THE NATIONAL WATER & SANITATION MASTER PLAN WEST RAND DISTRICT MUNICIPALITY DATE: 16 AUGUST 2017
2
INDEX Background Water & Sanitation Programmes Challenges
3
BACKGROUND The West Rand District Municipality consists of the following: Mogale City Local Municipality Rand West City Local Municipality (Randfontein & Westonaria) Merafong City Local Municipality All LM’s are WSA’s
4
WATER & SANITATION PROGRAMS WITHIN THE WEST RAND
LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED MCLM Lindley / Muldersdrift Area - Reservoirs 3 x 15-20Ml R 100M No Lindley / Muldersdrift Area – Bulk pipe lines +- 50km R 125M Hekpoort Area - Reservoirs 1 x 10-15Ml R 35M Hekpoort Area - Bulk pipe lines +- 30km Magaliesburg & Tarlton Area - Reservoirs 2 x 10-15Ml Magaliesburg & Tarlton Area - Bulk pipe lines +- 15km R 70M Kagiso & Krugersdorp Area- Reservoirs Kagiso & Krugersdorp Area- Bulk pipe lines +- 20km R 50M
5
WATER (Cont.) LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED RWCLM
Westergloor Reservoir 6,8Ml R 150M No Finsbury Reservoir 3,0Ml R 50M Zuurbekom Reservoir 22Ml R 120M Bekkersdal Reservoir 12Ml R 30M Reservoir Zone Metering - MECLM Fochville / Koksi Area – Reservoir & Water Tower 30Ml R 159M Varkenslaagte & Khutsong South Reservoir & Bulk Pipe Lines 11,75Ml R 76M Khutsong Reservoir & Bulk Pipe Lines R 85M Wedela Reservoir – PRV Refurbishment R 1M
6
SANITATION LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED MCLM
Lindley Wastewater Treatment Works & Reclamation Facility 200Ml/day R 1,5B No Muldersdrift Bulk Outfall Sewer - Pine Haven to Lanseria Various R 116M Hekpoort Wastewater Treatment Works & Reclamation Facility 7Ml/day R 178M MIG BP Hekpoort Bulk Outfall Sewer with pump-stations - R 45,4M Magaliesburg Wastewater Treatment Works R 60.8M Magaliesburg Bulk Outfall Sewer from Tarlton & Koster R 64,2M Flip Human Wastewater Treatment Works Reclamation of effluent to Zuurbekom GIFA to assist with Bankability & Feasibility Studies Accredited Water & Sanitation Laboratory R 50M
7
SANITATION (Cont.) LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED RWCLM
Zuurbekom Waste Water Treatment Works 80Ml/day R 1,0B DWS Upgrade Randfontein WWTW 30Ml/day R 150M No Upgrade Badirile WWTW 10Ml/day R 100M MIG BP Refurbishment Sewer infrastructure: Mohlakeng, Toekomsrus & Bekkersdal Various R 200M R 1,2M design from MIG MECLM Upgrade Koksi WWTW & Pump Station 7,5Ml/day R98,5M Varkenslaagte & Khutsong South WWTW & Outfall Sewer (800mm dia). R 375,7M (Total Three Phases). Refurbishment Oberholzer / Carletonville WWTW – Mechanical & Electrical Components - R2,0M Refurbishment Wedela WWTW –Electrical Components & Upgrade Outfall Pipe Line R50M
8
CHALLENGES Funding – capital & Operational
Shortage of skills – Technical & Operational Drought – Water Restrictions Electricity cost Land availability Ageing Infrastructure Dedicated Water Loss Divisions Telemetry Equipment
9
Thank You
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.