Presentation is loading. Please wait.

Presentation is loading. Please wait.

on behalf of the AGH and UJ PANDA groups

Similar presentations


Presentation on theme: "on behalf of the AGH and UJ PANDA groups"— Presentation transcript:

1 on behalf of the AGH and UJ PANDA groups
Electronics status J. Smyrski on behalf of the AGH and UJ PANDA groups Tests of the AGH front-end ASIC News on the TRB v.3

2 Front-end architecture

3 ASIC – first prototype

4 The ASIC test-board v. 2. 1 ASIC (4 channels) Digital LVDS outputs
Buffered analog outputs ATMega controller for ASIC parameters (gain, shaping) Baseline and threshold set with external voltage source

5 Examples of output pulses
(Radioactive source: 55Fe) tail due to saturation in the shaper HV: 1950 V HV: 1800 V

6 Examples of output pulses
(Radioactive source: 90Sr) tail due to saturation in the shaper HV: 1800 V HV: 2000 V

7 TOT spectra with 55Fe TOT spectra Counts vs. HV HV= 1650 V 1750 V

8 TOT measurement with 55Fe

9 TOT measurement with 90Sr
(four different thresholds) Drift time [ns] TOT [ns] Drift time [ns] TOT [ns]

10 ASIC test board (v. 3.) 32-channel board (8 times 4-channel asic on board) individual threshold control for each channel two 2*17 pin 100 mils header input connector LEMO test input: odd channels, even channels, all channels charge injection individual base line setting for each asic 40 12-bit DACs on board (5 times 8-channel chip) time over threshold digital LVDS outputs buffered analog outputs: common mode voltage = baseline voltage pulse amplitude 0 – 1 V positive pulse ATMega controller for asic parameter and DAC setting USB 2.0 access from PC serial access from TRB 17 cm 13 cm

11 TRB v.3 – STT read out system status

12 Multi-Test AddOnn


Download ppt "on behalf of the AGH and UJ PANDA groups"

Similar presentations


Ads by Google