Validation of Maintenance Requirement Card
2
Validation of Maintenance Requirement Card
Validate MRC using the work center PMS Manual Maintenance person review MRC before accomplishment Follow appropriate safety precautions, hazardous material, PPE, Lockout/Tag-out Identify tools, parts, material and test equipment Identify the equipment using EGL Demonstrate all the steps of maintenance requirement VALIDATE MRC USING THE WORK CENTER PMS MANUAL: Validation of MRC (MRC to MIP, LOEP, Change Page) Maintenance person review MRC become generally familiar with the actions needed to accomplish the MR Follow appropriate safety precautions, hazardous material, PPE, Lockout/Tag-out Identify tools, parts, material and test equipment Identify the equipment using EGL Demonstrate all the steps of Maintenance Requirement
3
Conduct Tag-out Procedures
4
Conduct Tag-out Conduct standard tag-out procedures for maintenance requirement Provide personnel safety and prevent equipment damage Authorizing Officers are responsible for the strict enforcement of the tag-out requirements Responsible for the administration of the tag-out log All personnel must be familiar with tag-out procedures CONDUCT TAG-OUT: Conduct standard Tag-out procedures for Maintenance Requirement Provide personnel safety and prevent equipment damage Authorizing Officers are responsible for the strict enforcement of the tag-out requirements Responsible for the administration of the tag-out log All personnel must be familiar with Tag-out procedures Conduct Tag-out of Arc Welder/ Lock-out of Forklift Truck
5
Review and Summary
6
Point of Contacts Thomas.Olson @ams.com Kelly.Ingold @ams.com
AMS 800 Number: various links and information related to 3M-system