Presentation is loading. Please wait.

Presentation is loading. Please wait.

L1Calo Joint Meeting The beginning…

Similar presentations


Presentation on theme: "L1Calo Joint Meeting The beginning…"— Presentation transcript:

1 L1Calo Joint Meeting The beginning…
…or possibly the middle… …but definitely not the end 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

2 Repetition No. 1: Luminosity
Integrated Luminosity since ‘Media Day’ Note the units (µb-1) 900 GeV doesn’t count any more Mind the gaps Watch out for uneven steps 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

3 L1Calo Joint Meeting 13/15th-17th September 2010
Recent Update Note the units (pb-1) Long break for bunch train Machine Development Will come back at similar luminosity (1031) but then increase rapidly Integrated Luminosity since ‘Media Day’ Time covered In previous plot 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

4 Repetition No. 2: Heidelberg
Just possible to convince ourselves that L1Calo rates in 2009 scaled with luminosity 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

5 L1Calo Joint Meeting 13/15th-17th September 2010
Repetition No. 3: early 2010 Luminosity scaling now obvious Backgrounds small, low threshold rates significant enough to require prescaling TE10 pre-scale change 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

6 L1Calo Joint Meeting 13/15th-17th September 2010
Latest Update Some rates no longer scale Already starting to see (in-time) pile-up Obviously TE is most sensitive FJ and XE also quite affected by pile-up Small increase seen in J5 too 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

7 But this is an Upgrade session!
I believe there’s a lot we can already learn from this low-luminosity data In time pile-up already present Out of time pile-up will arrive any day now Admittedly not at 1034 levels Planned bunch separation 150 ns in 2010 In time pile-up still factor of about 10 down But maybe enough to validate simulation? Would be nice to have some independent check! Could also select and study high multiplicity events Currently running at ~1 min bias interaction per crossing Tail of events with higher multiplicity up to ~10 (0.05 Hz) 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

8 L1Calo Joint Meeting 13/15th-17th September 2010
Heavy Ions are coming Another interesting check of system with high occupancy RoI multiplicities with low thresholds Interesting objects on top of large background Potentially a useful test-bed for tweaking parameters to control ‘underlying events’ Noise cuts, Jet element thresholds Obviously do this ‘offline’ not in real-time 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

9 L1Calo Joint Meeting 13/15th-17th September 2010
Interesting times Yes the L1Calo trigger is fundamentally working But there’s so much more to improve and learn Even with a relatively low integrated luminosity Still need a large effort over the next year Particularly before the 2011 run gets started Ideally we should run in a stable ‘perfect’ configuration throughout 2011 Yet to define what ‘perfect’ means What scale, calibration procedures, filters, etc Meanwhile the Upgrade looms faster than ever 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

10 L1Calo Joint Meeting 13/15th-17th September 2010
Meeting Structure Wednesday (here, but only AM) AM: Upgrade PM: Trigger General Meeting 17:00: Management Meeting 3150-R-002 Thursday (here) AM: Upgrade Overflow, System Status PM: Calorimeters and Calibration Group Meal (Bois Joly, Crozet) Friday (40-4-C10) Timing Calibration and Wrap-Up Note to speakers: Make sure work background is clear Try to avoid L1Calo jargon All sessions on same EVO meeting ID 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010

11 L1Calo Joint Meeting 13/15th-17th September 2010
Meal and Fees Group meal tomorrow, Bois Joly Meal starts at 20:00 Meet in Restaurant No. 1 at 19:30 for transport I will try to arrange cars over the next day Apologies in advance to vegetarian! Fee will be 100 CHF for those attending meal No fee for others (I’m feeling generous) Note Run Coordination BBQ tonight 15/09/2010 L1Calo Joint Meeting 13/15th-17th September 2010


Download ppt "L1Calo Joint Meeting The beginning…"

Similar presentations


Ads by Google