Download presentation
Presentation is loading. Please wait.
Published byBridget Sharp Modified over 6 years ago
1
Participatory Budgeting in the Municipality of Elbasan
2
Participatory Budgeting Cycle
Start up and Memorandum of Understanding Memorandum of Understanding and Municipal Council Approval Contracting local NGOs: RDA, CSDC 1 Organization and Training Training of Municipal staff and local NGOs Sensitization campaign Geographical division Poverty mapping, under the framework of strategic planning 2 Capacity Building Ky slight shoqerohet me slight-in me te plote (te marre nga propozimi) qe do ta kene te printuar perpara. Communication Campaign
3
Participatory Budgeting Cycle
First Cycle 10 community meetings Information campaign: PB process; demystification of municipal budget; municipal investments for 2005 3 Capacity building 4 Foto procesi Second cycle 10 community meetings Selection of priorties Election of the community representatives 4 Ky slight shoqerohet me slight-in me te plote (te marre nga propozimi) qe do ta kene te printuar perpara. Communication campaign
4
Participatory Budgeting Committee
Elbasan City Development Strategy 10 community representatives 10 municipal staff Participatory Budgeting Community Municipality of Elbasan Co-PLAN ERDA and CSDC University “A. Xhuvani” 4 representatives from thematic groups 10 community representative with no voting power Municipal council representatives with no voting power
5
Participatory budgeting cycle
2 days Caravan 5 meetings of the PB commettee 2 meetings: training and criteria setting 3 meetings: priority assessment and approval of the final list of priorities Negotiation phase 5 Capacity building 4 Foto nga Karvani dhe Komisioni Communication campaign Ky slight shoqerohet me slight-in me te plote (te marre nga propozimi) qe do ta kene te printuar perpara.
6
Participatory budgeting
Institutionalization and sustainability of the process PBP within the process for strategic planning Involvement of civic society: local NGOs and University Involvement of local media and continous transparency Set a budget line in the municipal balance sheet to support PBP in the future years Ky slight shoqerohet me slight-in me te plote (te marre nga propozimi) qe do ta kene te printuar perpara.
7
Participatory budgeting
To be taken into consideration: improvement of the PBP in the future Review the territorial division Review the citizen engagement process Establishment of a monitoring system Initiation of the PBP – when? Ky slight shoqerohet me slight-in me te plote (te marre nga propozimi) qe do ta kene te printuar perpara.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.