1 H1 Detector Upgrade Installation
HERA Luminosity Upgrade K.Gadow/DESY PXD/SVD Mockup MPI

2 PXD/SVD Mockup Meeting @ MPI
H1 Detector Upgrade HERA SC Magnet GO HERA SC Magnet GG H1 Central Upgrade Region K.Gadow/DESY PXD/SVD Mockup MPI

3 LAr Cryostat Upgrade Volume
Inner Cryostat Vessel Interaction Point Beamaxis K.Gadow/DESY PXD/SVD Mockup MPI

4 Central Tracking Installation
GO Magnet Support CIP Chamber K.Gadow/DESY PXD/SVD Mockup MPI

5 PXD/SVD Mockup Meeting @ MPI
GO Magnet Support Integratet Tracking Detector Carbon Structure Hydraulic Moving System K.Gadow/DESY PXD/SVD Mockup MPI

6 CIP Installation into CJC
K.Gadow/DESY PXD/SVD Mockup MPI

7 CJC - Central Jet Chamber
COP COZ CJC 1 K.Gadow/DESY PXD/SVD Mockup MPI

8 H1 Detector in Service Position
FTD - Forward Tracking Detector K.Gadow/DESY PXD/SVD Mockup MPI

9 PXD/SVD Mockup Meeting @ MPI
FTD Installation Inner Cryostat Vessel GO Support Pipe FTI 2 K.Gadow/DESY PXD/SVD Mockup MPI

10 Central Tracking Installation
GO Support CJC K.Gadow/DESY PXD/SVD Mockup MPI

11 PXD/SVD Mockup Meeting @ MPI
CTD Installtion GO Support Pipe Fixation K.Gadow/DESY PXD/SVD Mockup MPI

12 GO Magnet and Central Beampipe
K.Gadow/DESY PXD/SVD Mockup MPI

13 GO Magnet and Central Beampipe
K.Gadow/DESY PXD/SVD Mockup MPI

14 GO Magnet / Central Beampipe installed
K.Gadow/DESY PXD/SVD Mockup MPI

15 GO Magnet and Support A Installed
LAr Cryostat K.Gadow/DESY PXD/SVD Mockup MPI

16 Central Beampipe Installed
CIP Beampipe CJC1 K.Gadow/DESY PXD/SVD Mockup MPI

17 H1 Detector moves into Beam Position
K.Gadow/DESY PXD/SVD Mockup MPI

18 FST – Forward Silicon Tracker Installation
K.Gadow/DESY PXD/SVD Mockup MPI

19 FST – Forward Silicon Tracker Installation
K.Gadow/DESY PXD/SVD Mockup MPI

20 FST – Forward Silicon Tracker installed
K.Gadow/DESY PXD/SVD Mockup MPI

21 CST - Central Silicon Tracker
Term Shield CST K.Gadow/DESY PXD/SVD Mockup MPI

22 CST - Central Silicon Tracker
Adapter Pipe K.Gadow/DESY PXD/SVD Mockup MPI

23 BST – Backward Silicon Tracker
K.Gadow/DESY PXD/SVD Mockup MPI

24 BST – Backward Silicon Tracker
K.Gadow/DESY PXD/SVD Mockup MPI

25 Silicon Trackers ( Vertex ) installed
FST CST BST K.Gadow/DESY PXD/SVD Mockup MPI

26 Vacuum System completed
Bellow Central Beampipe GG Magnet K.Gadow/DESY PXD/SVD Mockup MPI

27 PXD/SVD Mockup Meeting @ MPI
GG Magnet installed GG Magnet K.Gadow/DESY PXD/SVD Mockup MPI

28 PXD/SVD Mockup Meeting @ MPI
GG Magnet Supports GG Magnet Support A GG Magnet Support B GG Magnet K.Gadow/DESY PXD/SVD Mockup MPI

29 PXD/SVD Mockup Meeting @ MPI
BPC – Installation BPC K.Gadow/DESY PXD/SVD Mockup MPI

30 BPC – Backward Proportional Chamber
K.Gadow/DESY PXD/SVD Mockup MPI

31 PXD/SVD Mockup Meeting @ MPI
BPC - Installed BPC K.Gadow/DESY PXD/SVD Mockup MPI

32 EM Spacal Installation
K.Gadow/DESY PXD/SVD Mockup MPI

33 EM Spacal – Electromagnetic Spagetti Calorimeter
K.Gadow/DESY PXD/SVD Mockup MPI

34 PXD/SVD Mockup Meeting @ MPI
EM Spacal installed EM Spacal K.Gadow/DESY PXD/SVD Mockup MPI

35 PXD/SVD Mockup Meeting @ MPI
EM Spacal installed EM Spacal K.Gadow/DESY PXD/SVD Mockup MPI

36 HD Spacal Installation
K.Gadow/DESY PXD/SVD Mockup MPI

37 PXD/SVD Mockup Meeting @ MPI
HD Spacal installed HD Spacal K.Gadow/DESY PXD/SVD Mockup MPI

38 HD Spacal – Hadronic Spagetti Calorimeter
K.Gadow/DESY PXD/SVD Mockup MPI

39 Closeing Inner Detector Volume
Nitrogen Shield K.Gadow/DESY PXD/SVD Mockup MPI

40 H1 Detector Upgrade Installation completed
GO Magnet GG Magnet FST CST BST CIP BPC GO Supporte GG Magnet K.Gadow/DESY PXD/SVD Mockup MPI

41 PXD/SVD Mockup Meeting @ MPI
Close North Shell North Shell GO Magnet K.Gadow/DESY PXD/SVD Mockup MPI

42 Close H1 Detector Iron Yoke
North Shell South Shell GO Magnet K.Gadow/DESY PXD/SVD Mockup MPI