1 Cryoplant Installation Package - Mechanical
JLab LCLSII Cryoplant Installation Package, Director’s Progress Review Michael Bevins June 1, 2017

2 Outline LCLSII Cryoplant Installation Scope/Layout
Cryoplant Installation Design Roles/Activities JLab/SmithGroup/SLAC/GC Cryoplant Installation GC Package – Define Jlab Deliverables Define GC Scope Categories SOW/Specification/Drawing Package Analysis/Reports (for SLAC BIO, not included in RFP) P6 Schedule Resources Assigned JLab Deliverables, Status & Remaining work Plan for Completion of JLab GC Package Deliverables Summary

3 Cryoplant Scope/Layout

4 Cryoplant Scope/Layout
Tank Farm North Slab –CP1 North Slab – CP2 CP1 Comp Room CP2 Comp Room Cold Box RM CP1 Cold Box RM CP2

5 Cryoplant Scope/Layout
CP1 Oil Removal CP1 4.5K Cold Box LN2 storage CP1 Warm Compressors GHe storage CP1 2K Cold Box CP1 MCCs Control Rm Interface Boxes Cryoplant 1 Cryoplant 2

6 Cryoplant Installation Design Roles/Activities
Jlab Cryoplant Arrangement/Equipment/Skid Design and equipment vendor coordination Equipment/Skid Anchorage Design (cast in place anchors & tank farm piers coordinated with SLAC/HDR) Warm Piping & Cryogenic Transfer Line(TL) Design w/associated ref design support/locations/loads Engineering Analysis/Reports supporting Jlab designs Coordination with SmithGroup on the Platform and Specifications SmithGroup(SG) – SLAC contracted design assist services Producing a complete set of construction specifications in CSI format, and integration of all drawings Producing design for cold box room platform for access to cold boxes/equipment in the cold box room SLAC Coordination of design activities between JLab, SmithGroup, and SLAC SOW (~ 10 Pages) Provide information for Specification: Site construction description(access rule, staging area, utilities provided) Schedule, contract requirements, construction site instruction Installation Sequences Design review of installation 75% Design Submittal Review, held on Mar 29, 2017 100% Design Submittal Review, to be held on Jul 7, 2017 Final submittal to Procurement July 17, 2017 GC Final piping supports design according to reference designs and locations/loads provided by JLab

7 GC Scope Categories Category Responsibility Example 0 – GC
To be procured, fabricated and installed by GC. Warm piping, electrical wiring/cable tray 1 - GFP(GC) Procured by JLab/SLAC, to be installed by GC, to be reassembled/welded by GC if necessary. ORS vessels, Cryogenic transfer lines, Instrument air system, PLC cabinets 2 - GFP(E) Existing Equipment/skid (installed before GC starts installation work) Warm Helium Compressor skids 3 - GFP(M) Procured by JLab/SLAC, to be installed by GC, to be reassembled/welded by Manufacturer, need coordination with SLAC/Manufacturer 4.5 K cold box, 2 K cold box 4 - GFP(SLAC) Procured by JLab/SLAC, to be installed by SLAC/Others Network switches, computers in the control room, U-tubes * GFP: Government Furnished Property

8 GC Scope Categories – 0 - GC
To be procured, fabricated and installed by GC. Example – Compressor Room Interconnecting Warm Piping

9 GC Scope Categories - Government Furnished Property 1 - GFP(GC)
Procured by JLab/SLAC, to be installed by GC, to be reassembled/welded by GC if necessary. Example – LN2 Transfer Lines LN2 TLs

10 GC Scope Categories - Government Furnished Property 2 - GFP(E)
Equipment installed prior to GC award (6)Warm He Tanks, (1) LN2 Dewar, 12 Warm He Compressors, CP1 4K CB’s

11 GC Scope Categories - Government Furnished Property 3 - GFP(M)
Equipment to be procured by JLab/SLAC, to be installed by GC, to be reassembled/welded by Manufacturer, need coordination with SLAC/Manufacturer 4K coldbox platform 2K coldbox and CC Interface Boxes Main transfer lines

12 Statement of Work (SOW)
SLAC authoring Statement of Work for the Cryoplant Equipment Installation JLab provides content for Appendix A: A-1 - Tech Specifications and Requirements… See SG Table of Contents (addressed in Specification slides) A-2 – JLab Drawings for Cryoplant (addressed in dwg package slides) A-3 – GFP equipment and delivery schedule (addressed in Specification slides) A-4 – List of pipe lines & equip interfaces (addressed in dwg package slides) A-5 – Subsystems requirements definition and need dates A-6 – Work performed by other subcontractors working directly for SLAC (scope, interfaces and schedule)(details pending JLab vendor definition) JLab deliverable – IN BLUE

13 Specification SmithGroup is producing the complete set of construction specifications in CSI format JLab is responsible for reviewing and providing content for: Division 01, General Requirements Includes list of Government Furnished Property (GFP) Division 05, Metals Platform coordination Division 40, Process Integration 8 sections related to process piping/supports Includes GC procured component lists Includes pipe line and equip interface lists (addressed in dwg package slides) JLab deliverable – IN BLUE

14 Specification - GFP Equipment List
List includes: Equipment Description Applicable cryoplant (C1, C2, or common C) Tag # Quantity GC Scope Category Designed by (eg., Jlab, vendor…) Fabrication/delivery responsibility General Arrangement dwg Offloading responsibility Set in position/anchoring responsibility Field re-assembly responsibility (GC, Vendor...) Elec/Inst./Piping Expected Delivery time Installation location

15 Specification - GFP Equipment List
GFP: a total of 140 lines for mechanical

16 Specification – GC Procured Component Lists
List of electric valves, solenoid valves (<=2”), check valves (<=2”), filters (<=2”), and pressure regulators to be procured by the GC

17 Drawing Package Block Diagram/P&IDs Line List & Interface List
Layout Drawings Piping Drawings Piping Assembly/Spools Piping supports Build-to-Print (Tank Farm) Support Location/Load drawings Standard details Equipment Drawings Equipment/Skid General Arrangement Equipment/Skid Installation 3-D model will be provided to GC for reference JLab deliverable – IN BLUE

18 Drawing Package - Cryogenic Plant Block Diagram

19 Drawing Package - P&IDs
LCLSII P&IDs Include: *Instrument/Valve Tags *Installation/GC Scope Category/Boundary Line numbering *Interface Numbering *Information shown on mech piping dwgs

20 Drawing Package - P&ID List
NUMBER DRAWING # Released REV. DRAWING TITLE Duplicate for CP2 1 A FLOW DIAGRAM SYMBOLS NO 2 B CRYOGENIC PLANT BLOCK DIAGRAM 3 MAIN COMPRESSOR SYSTEM (MCS) YES 4 D LP STAGE COMPRESSOR 5 MP STAGE COMPRESSOR 6 HP STAGE COMPRESSOR 7 OIL REMOVAL SYSTEM (ORS) 8 MCS DEPRESSURIZATION MANIFOLD (DPM) 9 OIL MANAGEMENT SYSTEM (OMS) 10 OIL PROCESSOR SKID 11 He GAS DISTRIBUTION SYSTEM (HGD) 12 COOLDOWN/CLEAN UP DISTRIBUTION SYSTEM (CDUS) 13 RELIEF VALVE DISCHARGE COLLECTOR 14 - He GAS ANALYZER SYSTEM 15 MAIN 4.5K COLD BOX TEST 16 MAIN 4.5K COLD BOX (MCB) (ALAT DESIGN) 17 C 2K COLD BOX WITH COLD COMPRESSOR (SCB) 18 INTERFACE BOX SYSTEM 19 He RECOVERY SYSTEM (HRS) 20 He PURIFIER SYSTEM 21 He RECOVERY COMPRESSOR 22 COOLING WATER SYSTEM (CWS) 23 COOLING WATER SYSTEM (FOR TURBINES & COLD COMPRESSORS) 24 INSTRUMENT AIR SYSTEM (IAS) 25 INSTRUMENT AIR DISTRIBUTION SYSTEM 26 He GAS STORAGE SYSTEM (HGS) 27 LHe STORAGE DEWAR SYSTEM (LHD) 28 LN2/GN2 DISTRIBUTION SYSTEM (NDS) 29 LN2 DEWAR 20,000 GAL 30 GUARD VACUUM SYSTEM (GVS) 31 80K BED VACUUM PUMP CART

21 Drawing Package - P&ID Example
Line Number Installation GC Scope Category/ Boundary Interface Number

22 Drawing Package – GC Scope Piping Line List
Line numbers: a total of 410

23 Drawing Package – GC Scope Interface List
Interface: a total of 630 Interface #’s Identified on Piping Assy Dwgs

24 Drawing Package - Drawing Tree
LP Spool 2 LP Spool 1 LP Piping Assembly Comp Room Equip Installation LP Spool 3 MP Piping Assembly Helium Piping Arrangement, West Swing Suction Spool 3

25 Drawing Package - Moving Up and Down Drawing Levels
The drawing the next level down is specified in the BOM The drawing the next level up is specified in the Title Block

26 Drawing Package - Site Plan Layout (0020)

27 Drawing Package - Building Layout (0022)
75% Design Peer / BIO Review, March 29, 2017

28 Drawing Package - CP1 Layout (0023)

29 Drawing Package - Compressor Room 1 Layout (0026)

30 Drawing Package – He Piping Arrangement (-0655)
Spool Fabrication Level

31 Drawing Package – LP He Piping Assembly (-0465)
Spool Fabrication Level

32 Drawing Package – LP Spool 1 (-0468)
Spool Fabrication Level

33 Drawing Package – O-Ring Groove
Component Detail Drawings are specified in the BOM

34 Drawing Package – Slip-On Flange Weld Detail
Fabrication Detail Drawings are specified in the drawing notes

35 Drawing Package – Equipment/Skid GA

36 Drawing Package - Equipment/Skid Installation Drawing

37 Drawing Package – Drawing Tree/List

38 Analysis/Reports Engineering analysis supporting the GC installation scope must be submitted to the SLAC Building Inspection Office (BIO) for review/approval Pipe Stress/Relief Valve Calculation Notes (20) Structural/Anchorage Design Notes (27) JLab deliverable – IN BLUE

39 P6 Schedule Activity ID Activity Start Finish CP_ED_700
Generate He Tank Farm Documentation 03-Apr-17 A 19-May-17 CP_ED_7001 Generate Oil Removal System Anchorage Documentation 10-Apr-17 A CP_ED_7002 Generate P&ID Line Index 27-Apr-17 A CP_ED_7003 Generate CP1 and CP2 Compressor Room Documentation 15-Jun-17 CP_ED_7004 Generate GC Installation Drawing Package and Submit Partial BIO Package CP_ED_7005 Submit Remainder of GC BIO Package 16-Jun-17 29-Jun-17 CP_ED_70051 SLAC Review of Package Prior to BIO/FDR 30-Jun-17 14-Jul-17 CP_ED_7006 Conduct GC Installation Package BIO and FDR 17-Jul-17 CP_ED_705M COMP: GC Installation Package Final Design Review (FDR) CP_ED_715M COMP: GC Installation Package Submitted to SLAC for RFP 24-Jul-17 CP_ED_735 Finalize GC Installation Package Portion of the Lhe Dewar Neck Cans Design 22-May-17 14-Jun-17 CP_ED_740 Finalize GC Installation Package Portion of the Lhe to 2k Cold Box, Cooldown & Adsorber Transfer Lines 2-Jun-17 13-Jun-17 CP_ED_745 Finalize GC Installation Package Portion of the Interface Box to 2K/4.5K Cold Box transfer CP_ED_748 Finalize GC Installation Package Portion of the Interface Box Design and Fabrication Specification CP_ED_770 Finalize GC Installation Package Portion of the Secondary Cooling Water Skids Design 1-May-17 3-May-17

40 Resources Assigned Count by skill type: MGT: 2 MEng: 10 MDes: 17 Name
Lab, Org Skill Type Location Supporting D. Arenius Jlab, MSCRYO MGT Bldg. 89 CAM M. Bevins Jlab, MSMECH Meng/MGT Deputy CAM B. Crahen MEng Bldg. 87 Warm sys C. Dubbe N. Laverdure Warm/Cold sys M. Marchlik TEDF S. Kaminski SLAC Hongyu Cold sys Vishy C. Kaufman F. Fors S. Yang P. Hansen MDes C. Butler J. Tschirhart D. Spell D. Rath R. Wilson G. Hays S. Gregory T. Crahan MDes_contract C. Patrosso F. Martin R. Stori W. Sachleben J. Armstrong K. Harding C. Hutton M. Wade MDes - Student Count by skill type: MGT: 2 MEng: 10 MDes: 17

41 JLab Deliverables Status/Remaining Work – Specification
Deliverable: Review and provide content for specifications and coordinate integration of SG platform design into the plant Division 01, General Requirements Includes list of Government Furnished Property (GFP) Status: Draft specs developed and under review GFP draft list developed Remaining Work: Provide comments on draft specs Complete review/check of GFP list Division 05, Metals Platform coordination Latest SG platform model integrated into JLab 3D model Provide SG updated 3D models Provide SG weight/CG of 2K box panels that will be mounted to the platform

42 JLab Deliverables Status/Remaining Work – Specification
Deliverable: Review and provide content for specifications and coordinate integration of SG platform design into the plant Division 40, Process Integration 8 sections related to process piping/supports Includes GC procured component Status: Draft specs developed and under review Draft GC procured component list developed Remaining Work: Provide comments on draft specs Coordinate with SG to include spec language and table of loads for GC provided piping supports

43 JLab Deliverables Status/Remaining Work – Analysis/Reports
Deliverables: Analysis/Reports Status: Structural/Anchorage Notes (27) 6 Approved 2 Draft complete – in review 8 In work 11 Pending vendor Pipe Stress/Relief Valve Calculation Notes (20) 1 Approved 12 Draft complete – in review 7 In work

44 JLab Deliverables Status/Remaining Work – Drawing Package/ Line & Interface Lists
Block Diagram/P&IDs Status: Complete Remaining Work: Monitor track any corrections/edits that may be uncovered as the drawing package is finalized Line List & Interface List Draft line and interface lists developed Incorporate reference to piping assembly dwg in lists Review and finalize line and interface lists Drawing Index Drawing tree developed Monitor and track and corrections/edits that may be uncovered as the drawing package is finalized Develop drawing index with SG to best organize the drawing list for incorporation into the RFP 44

45 JLab Deliverables Status/Remaining Work – Drawing Package/ Line & Interface Lists
Deliverables: Drawings… Status: 45

46 Plan for Completion of JLab GC Package Deliverables – Drawing Effort Estimate to Complete
A tracking/projection tool for drawing package completion has been developed which accounts for: Number of Drawings, Drawing Type, Document Maturity Effort to move each drawing type from 1 phase to the next As of May 15 – 2,776 hours of effort were projected As of May 30 – 1,812 hours of effort remain Average 482 hrs effort completed per week – 3.76 weeks of effort remain – complete the week of June 19 Sensitivity Analysis of Estimate 25% - add one week – complete the week of June 26 50% - add two weeks – complete the week of July 3

47 Plan for Completion of JLab GC Package Deliverables
While every effort is being made to pull the completion date back to June 15th, based on the recent dwg production rate, coupled with continued uncertainties associated with time spent on other efforts (i.e, SG/SLAC coordination, vendor oversight, CAD software issues) completion the week of July 3rd is probable A detailed week by week task based plan has been developed to track progress to completion

48 Plan for Completion of JLab GC Package Deliverables
Week of May 29 Design Prepare for Director’s Review Incorporate redlines / issue drawings for Compressor Room Main Helium Piping Main Cooling Water Piping Depressurization Piping Compressor Room Main Recovery Compressor Piping Compressor Room Relief Piping Revise, issue Standard Detail drawings Prepare drawings for check for Secondary Cooling Water Piping North Slab Piping GC Cryogenic Piping Instrument Air Piping Oil Piping Main Helium Compressor Equipment Interface Engineering Prepare for Director’s Review Ongoing Vendor Review and Coordination Review SG specifications Review Drawings Standard Details Compressor Room Main Helium System Piping Compressor Room Main Recovery Compressor System Piping Compressor Room Relief Piping Backcheck Drawings Main Cooling Water System Piping Depressurization Piping Progress Analysis Instrument Air Piping System UCB Platform Anchors Cold Box Room Relief Piping Cryogenic Piping Support Loads Review / Revise Analysis Reports Main Helium Piping System

49 Plan for Completion of JLab GC Package Deliverables
Week of June 5 Design Incorporate redlines / issue drawings for GC Cryogenic Piping North Slab Piping Secondary Cooling Water Piping Main Helium Compressor Equipment Interface Prepare piping drawings for check for North Slab Instrument Air System Oil System Engineering Ongoing Vendor Review and Coordination Review SG specifications Summarize Pipe Support Loads Review Drawings GC Cryogenic Piping Main Helium Compressor Equipment Interface North Slab Piping Secondary Cooling Water Piping Backcheck Drawings Progress Analysis Instrument Air Piping Gas Management System Anchors Helium Distribution System Piping Interface Box / Transfer Line Anchor Analysis Cryogenic Piping Support Loads Prepare Analysis Reports CP2 Cooling Water Piping Relief / Depressurization Piping Review / Revise Analysis Reports Relief Valve Sizing Notes Revise Oil Coalescer Anchor Notes Revise LCB Shear Key Note CP1 Cooling Water Piping Report Guard Vacuum Piping Report

50 Plan for Completion of JLab GC Package Deliverables
Week of June 12 Design Incorporate redlines / issue drawings for North Slab Piping Secondary Cooling Water Piping Instrument Air Piping Oil Piping Prepare piping drawings for check for Support Reference Design / Piping Load Cold Box Room Relief Header Piping Engineering Ongoing Vendor Review and Coordination Summarize Pipe Support Loads Review Drawings Instrument Air Piping Oil Piping North Slab Piping Backcheck Drawings Secondary Cooling Water Piping Progress Analysis Update MCS Piping Update He Tank Farm Prepare Analysis Reports Fill Station Structural Helium Distribution Piping Helium Tank Farm Pipe Supports Interface Box / Transfer Line Anchors Updated MCS Piping Updated He Tank Farm Piping Gas Management System Anchors Relief / Depressurization Piping Review / Revise Analysis Reports LN2/GN2 Piping CP2 Cooling Water Piping

51 Plan for Completion of JLab GC Package Deliverables
Week of June 19 Design Incorporate redlines / issue drawings for Support Reference Design / Piping Load North Slab Piping Instrument Air Piping Cold Box Room Relief Piping Prepare piping drawings for check for Equipment Installation Engineering Ongoing Vendor Review and Coordination Review Drawings North Slab Piping Support Reference Design / Piping Load Cold Box Room Relief Piping Backcheck Drawings Instrument Air Piping Progress Analysis Update Recovery Compressor Skid anchor analysis Prepare Analysis Reports LN2 Tank Farm Pipe Support Recovery Compressor Anchors Guard Vacuum Anchors Review / Revise Analysis Reports Oil Piping Fill Station Structural Helium Distribution Piping Helium Tank Farm Pipe Supports Interface Box / Transfer Line Anchors Updated MCS Piping Updated He Tank Farm Piping Secondary Cooling Water Piping Gas Management System Anchors Relief Header / Depressurization Piping

52 Plan for Completion of JLab GC Package Deliverables
Week of June 26 Design Incorporate redlines / issue drawings for Support Reference Design / Piping Load Equipment Installation North Slab Piping Updated Plant Layouts Prepare piping drawings for check for Collect For Information Only drawings Engineering Ongoing Vendor Review and Coordination Collect For Information Only documents Review Drawings Equipment Installation Support Reference Design / Piping Load Updated Plant Layout For Information Only Backcheck Drawings North Slab Piping Progress Analysis 2K Cold Box Vacuum Pump Anchors Prepare Analysis Reports Review / Revise Analysis Reports LN2 Tank Farm Pipe Support Recovery Compressor Anchors Guard Vacuum Anchors

53 Plan for Completion of JLab GC Package Deliverables
Week of July 3 Design Finished remaining drawing redlines, issuance Progress non-GC installation work (as time allows) Gas Management Skid drawing revisions Cryogenic Piping procurements 2K Cold Box Re-Design Engineering Finish remaining report review and revisions Ongoing Vendor Review and Coordination Prepare for FDR Progress procurements (as time allows) Gas management skid Instrument Air System Cryogenic Piping Secondary Cooling Water Skids Progress 2K CB Re-Design (as time allows)

54 Summary The scope and level of detail of the JLab deliverables as presented here is well defined While various formats and level of detail can be used to bid and execute projects, the current format and level of detail is considered suitable to obtain a fixed-price bid and execute the project The present status of the JLab deliverables and remaining work is well understood and has been presented Projections for completion of the work extend beyond the project deadline Current resources supporting this effort have been identified and will be available for the duration of this work Additional potential resources have been identified and will be used if their contribution will accelerate completion A task based plan to completion has been developed and will be tracked weekly Thank you for your time and attention - we appreciate your feedback.