1 Input to project from IIP
Daglig borerapport Input to project from IIP

2 Summary Met and reviewed with operators and vendors
Statoil Hydro Conocophillips Total Vendors Peloton Landmark Approximately 140 issues

3 Main comments 1 Time codes/activities/operations Implementation input
Some of the CDRS structure is not logical to companies Superior to contain “BOP TEST” “INTERUPTION” not linked to operation interrupted Done differently Seems to be a need for more downtime details than CDRS provides (Phase2 ?) How to describe what is being done? (Phase 2?) Hydro suggests new structure Complex job.... Implementation input Formation should be selected from a list of legal values. General Project input How to handle tight wells

4 Main comments 2 Other relevant information which may be included (Phase 2?) Cementing Period of operation More “drilling like” units of measure Survey tools in stead of Single shot measurement indicator Selection of formation should be possible Datums (reference points) Mean sea level Wellhead Casing type Tapered string Expandable Pressurized coring Indicator

5 Main comments Continued... Well stimulation (At well testing) KICK
Indicator KICK “Shallow water kick” is a kick type Perforation Shot density RIG RIG ID (Included) RIGTYPE Bit data Side track Technical side track (BP) Geological side track (BP)

6 Open tasks in project Issue resolution
Comments from other project participants Report layout? Sections Header Survey Log Operations ..etc XML To ensure consistency between terminology and RDL, XML team should be involved now Specification has to tell XML team to include link (RDL ID) in XML schemas Pilots – how, where and when?

7 Current Plan Date Task 26.01  Project meeting (1-06)
 CDRS Drilling reporting terminology suggested.  Meeting Hydro 07.03  Meeting Statoil 08.03  Meeting ConocoPhillips 09.03  Meeting BP 10.03  Start updating according to feedback from meetings and review Project meeting (2-06) Terminology work complete 31.03 Start XML work 25.04 Project meeting (3-06) 23.05 Project meeting (4-06) 01.08 Start Pilot – 1 month 31.08 Project meeting (n-06) – decision to recommends implementation