Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operation Feasibility of 50 mbarg Design Pressure

Similar presentations


Presentation on theme: "Operation Feasibility of 50 mbarg Design Pressure"— Presentation transcript:

1 Operation Feasibility of 50 mbarg Design Pressure
Mark Adamowski LBN TPC Test at CERN Team Meeting 19 November 2014

2 Set-points and Operating Pressure
Mark Adamowski | LBN TPC Test at CERN Team Meeting 11/19/2014

3 Vent Size Check Mark Adamowski | LBN TPC Test at CERN Team Meeting
11/19/2014

4 Q & A Mark Adamowski | LBN TPC Test at CERN Team Meeting 11/19/2014

5 Supplemental Slides Mark Adamowski | LBN TPC Test at CERN Team Meeting
11/19/2014

6 LAr Loop Check – Cryostat to Filters and Back
Mark Adamowski | LBN TPC Test at CERN Team Meeting 11/19/2014


Download ppt "Operation Feasibility of 50 mbarg Design Pressure"

Similar presentations


Ads by Google