2015 Pavement Test Track Conference
Oklahoma Report By Kenneth Ray Hobson, P.E. March 4, 2015 Auburn, AL
2
Outline Review of Projects Findings/Implementation Future Work
3
Review of Projects - Costs
$621,158 $450,000 $900,000 $1,200,000 $1,020,000 $1,020,000?
4
Review of Projects - Research
2000 Compare Hveem Type B vs. ½" NMS Superpave Compare Skid Resistance 30% vs. 40% Insoluble Residue TRZ vs. ARZ
5
Review of Projects - Research
2003 Continue Traffic Traffic to 20 MESALs Total 2 Years More Aging
6
Review Projects - Research
2006 Compare Perpetual Designs On simulated Okla. Soil Base SMA surface and RBL 10" vs. 14" N8 vs. N9
7
Review Projects - Research
2009 Continue Traffic N9 (14") Perpetual Mill/Replace 5.5" N8 (10") + 2 Fabrics to Retard Cracking Group Experiment Participant
8
Review Projects - Research
2012 Continue Traffic N9(14") Perpetual Continue Traffic N8(10") HPM Rehabilitation Preservation Group Experiment Participant New OGFSC on E1 Two NT Tack Coat Types and Rates
9
2000 Findings/Implementation
Superpave (S13) Performed Similar to Hveem (S12) Higher Insoluble Residue = Better Skid Resistance TRZ (S12) vs. ARZ (S13) Performed Similarly
10
2000 Findings/Implementation
11
2000 Findings/Implementation
12
2003 Findings/Implementation
Same As 2000 Hveem and Superpave Performance Similar APA Adopted by ODOT
13
2006 Findings/Implementation
N8's 10" design was not perpetual Bottom-up cracking N9's 14" design was perpetual Designed and Built SH-152 near Airport
14
2009 Findings/Implementation
N8's fabrics retarded cracking for a bit Significant failure at 3.4 MESALs Geogrid repair failed at 3.6 MESALs HPM design successful RIL designed 2012 HPM Design & Constructed I-40 Caddo Co. PG 76E-28 (HPM) 1st MSCR Binder
15
2009 Findings/Implementation
16
2012 Findings/Implementation
N8 (10") repaired due to longitudinal joint 16.4 MESALs with cracking at end N9 (14") a bit more wheel path surface cracks E1 OGFSC performed well Use High Friction OGFSC on N9 2015
17
2012 Findings/Implementation
APA R2 = 0.70 Hamburg R2 = 0.75 Hamburg Adopted 2009
18
2012 Findings/Implementation
N8 May 11, 2011
19
2012 Findings/Implementation
E1 Tack Coats
20
Future Work - 2015 N9 E1 Fill Cracks 100' Micro-Mill 100'
Overlay High Friction OGFSC E1 Fill Longitudinal Joint Continue Traffic Experiment
21
Future Work Sponsor 2nd Cycle of Traffic for Preservation Group Experiment Sponsor New Cracking Group Experiment The Undiscovered Country
22
I hope this was fascinating. LLAP
– (405)
23
Acronyms P.E. – Professional Engineer AL – Alabama
TRZ – Through Restricted Zone ARZ – Above Restricted Zone MESALs – Million Equivalent Single Axle Loads SMA – Stone Matrix Asphalt
24
Acronyms RBL – Rich Bottom Layer RIL – Rich Intermediate Layer
HPM – High Polymer Mixture OGFSC – Open Graded Friction Surface Course NT – Non-Tracking or Nearly Trackless
25
Acronyms APA – Asphalt Pavement Analyzer
ODOT – Oklahoma Department of Transportation MSCR – Multiple Stress Creep Recovery (AASHTO M 332) NMS – Nominal Maximum Size LLAP – Live Long and Prosper