Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mec 21 Portfolio.

Similar presentations


Presentation on theme: "Mec 21 Portfolio."— Presentation transcript:

1 Mec 21 Portfolio

2 About Us Company “mec-21" was founded in 2008 and is supported with years of experience of every employee in engineering. Company is focused on installation and service of new technologies in engineering . Company main profile is: Administrative buildings, commercial spaces, offices, design and electrical installation work; Design and installation of computer networks;  Design and installation of video surveillance systems;  Design and installation of security and fire alarm systems;  Domestic telephone subscription networking (office, hotel, residential )  Heating, hot and cold water supply, ventilation and air conditioning system design and installation;  Fire sprinkler systems installation;  Access control, accounting and parking control systems installation;  Design and installation of BMS systems. For works listed above company has all the necessary equipment, as well as ventilation systems Duct manufacturing opportunity. To improve the quality, the company has acquired all the necessary machinery and tools, which can be obtained with the highest quality products. The company cooperates with Italian, German and other European producers. 

3 Graph of history Current projects
Weak electric installation in Hotel Linkani RESORT & SPA – Carrying amount 1,300, Gel Active future procets Air-conditioning and ventilation installation LTD “Discovery” buildings - Carrying amount 21, Gel

4 Recommendations Recommendation company names Contact Person
Contact information BSH-International Victor Shurakovsky ტელ: Corallaine Holdings Limited Evgeny Borisov ტელ: /60 Davit Tatishvili medical center Guram Tatishvili ტელ: ემ ჯი თბილისი Koba Svintradze ტელ: GSC transmsheni Tamazi Kotishadze ტელ: The most important part in our business is quality and we work on it constantly. Since its foundation more than 51 organizations have chosen to use our services and, and we are proud to have an opportunity to get a recommendation letter at any time from our user.

5

6

7 The list of works 1 2010 year - LTD “David tatishvili medical center” - Cooling and heating and ventilation system supply. 2010 year -isani-samgori board - heat-Air conditioner and ventilation systems supply. 2011year - sarphi custums : Fire alarm, computer network, telephone, television, access and video surveillance systems. 2011 year -Tbilisi “beeline” –in DATA room Precention-conditioning installation. 2011 year - khashuri hospital - Weak electric installation works. Air conditioning and ventilation systems of delivery. 2011 year – Samtredia hospital - Weak electric installation works. Air conditioning and ventilation systems of delivery. 2011year - baghdadi hospital - Weak electric installation works. Air conditioning and ventilation systems of delivery. 2011 year –oni hospital - Weak electric installation works. Air conditioning and ventilation systems of delivery. 2011year - tsageri hospital - Weak electric installation works. Air conditioning and ventilation systems of delivery.

8 The list of works 2 2011 year – mestia hospital - Weak electric installation works. Air conditioning and ventilation systems of delivery. 2011 year – LTD “discovery” - Air conditioning system installation. 2011 year – g.gvaramia hospital - Air conditioning and ventilation systems installation. 2012 year - #5 hospotal - Air conditioning and ventilation systems installation. 2012 year – tsiteli khidi custom – Low voltage systems installation works. 2012 year - gori “MPA” – Low voltage systems installation works. 2012 year - sarphi customs – Low voltage installation works.. 2012წ years - Hotel&SPA RIXOS - daba likani - Computer, telephone, television, sound, video surveillance, fire safety and automation systems installation and commissioning. 2012 year - LTD “new klinika‘-Air conditioning and ventilation systems installation 2012 year - ამხანაგობა "რუსთაველი‘ - Electrical installation work 2012 year - LTD "BALDOSI‘ - Air conditioning and ventilation systems installation 11

9 The list of works 3 2013 year - LTD "BALDOSI‘ - Air conditioning and ventilation systems installation. 2013 year - ააიპ "თემი და გარემო‘ - Air conditioning and ventilation systems installation. 2013 year - LTD "გრანდ ქენდი" - Weak electric installation works 2013 year – LTD "ოლ-პი ჯგუფი„ - Electrical installation work 2013 year – LTD "კოლიზიუმი ჯგუფი‘ - Import and sale of goods 2013 year - LTD"აქვა ტექნიქალ სისტემს‘ - Import and sale of goods 2014 year - JSC “transmshen‘ – Low voltage installation works 2014 year – LTD "EHRLE CAUCASUS„ - Electrical installation work 2014 year - LTD “discovery trevel„ - Air conditioning and ventilation systems installation. 2014 year - LTD “smart set„ - Air conditioning and ventilation systems installation.

10 The list of works 4 2014 year - GSCBorjomi Likani international„ Hotel Rixos VRV system supply, installation and commissioning 2015 year - JSC “borjomi likani international„ Hotel Rixos - Installation and commissioning of the conference system 2015 year - JSC “borjomi likani international „ Hotel Rixos - TV station installation and commissioning 2015 year LTD “M-line‘ Tbilisi Mall - Electricity, weak electric and automation systems for the supply, and commissioning 2016 year – Hotel Milenium & Imeli – BMS systems installation , all Low voltage systems installation and programming

11 ფოტო პორტფოლიო Hotel Rixos & SPA Hotel Rixos & SPA

12 ფოტო პორტფოლიო Hotel Rixos & SPA Hotel Rixos & SPA

13 ფოტო პორტფოლიო Hotel Citrus Sarph customer

14 Thank you 0159, Tbilisi, Akhmeteli str. 10a Tel: +995 32 46 33 48
          Fax:


Download ppt "Mec 21 Portfolio."

Similar presentations


Ads by Google