Download presentation
Presentation is loading. Please wait.
Published byReginald Glenn Modified over 6 years ago
1
Presented by Jon Pastuszynski, Lead M&D Engineer
Practical Experience & Lessons Learned Establishing a Centralized M&D Function Presented by Jon Pastuszynski, Lead M&D Engineer
2
Agenda Introductions Overview & Basic Tools
Industry Drivers for Centralized M&D Services M&D Approaches – Centralized / Distributed / Hosted / Local M&D Structure, Processes and Capabilities Lessons Learned Successes Questions / Discussion / Demonstration
3
THERMODYNAMIC MODELING
Monitoring and Diagnostics Support Services “Focus on the Customer” / Common Platform / Standardization THERMODYNAMIC MODELING MACHINERY DYNAMICS ANOMALY DETECTION Electronic Logs Automated Alerts / Notices / Reports Reports Diagnostic Guides Trending
4
Advanced Patter Recognition
Asset Sensors History APR Model Power Output Reactive Load Exhaust Temp IGV Position Inlet DP Bearing Temp Bearing Vibration Wheel Space Temps Etc.
5
APR Advantages and Differentiators
Flexibility of Application, Utilization, and Interface Functionally Integrated M&D Solution Expansion of Existing Platform Intuitive Tools for Managing Assets Flexible Expected APR Value Measures EtaPRO™ APR EtaPRO™ VirtualPlant™ EtaPRO Predictor™ Fewer False Positives
6
Need for Flexibility – IT Infrastructure
7
Thick Client Access
8
Web Client Access
9
Mobile Access
10
Industry Drivers for M&D Support
Portfolio Management Technology Diversity Changing Markets Regulator Compliance NERC, EPA, OSHA, SEC Reliability Run Profiles / Cycling Access to SMEs People Aging Workforce / Retirements Workforce Reductions Training, Qualification & Retention
11
M&D Structure – Roles and Responsibilities
M&D STAFF Staff Engineers Daily Monitoring Activities Issue Tracking Report Development MDC Manager Day to Day Operations Issue Review Subject Matter Experts Advanced Troubleshooting Performance Evaluations PLANT PERSONNEL Plant Liaison Coordinate Communications Information Exchange On-site Inspections Ops / Engineers Attend M&D Calls Provide Feedback / Plan of Action I&C / Maintenance Provide Ground Level Input Take Action
12
M&D Capabilities & Processes
Program Process GP Strategies collaborates with clients to formalize acceptable communication, reporting and documentation protocols.
13
M&D Capabilities & Processes
Detection and Logging by EtaPRO APR APR Generates Concerns Viewable through APR User Interface Concerns are generated through APR
14
M&D Capabilities & Processes
M&D Action Preliminary Analysis Senior Review Event Capture and Management Notification and Consultation
15
M&D Action Preliminary Analysis Senior Review
Centralized Tag Location and Expected Values Quick Access to P&IDs and Equipment Specs Equipment Maintenance History Senior Review Issue Confirmation Criticality Cycle Performance
16
M&D Action Event Capture and Management Notification and Consultation
Logging Procedure Internal Tracking System Status Updates Notification and Consultation Notification Weekly/Monthly Reports Routine M&D Projects Calls with Plant Issue Tracking System Internal Event Log
17
M&D Action Notifications Detailed Description Pending Status
18
M&D Action Routine Reports
19
Equipment Performance Summary
20
Status Details
21
Equipment Performance Details
22
Monthly Heat Rate Report
23
Month-to-Month Heat Rate Analysis
24
M&D Action Heat Rate and Controllable Parameters Adjustments Made
(soot blowing, air/fuel, etc…) 50 $/hr Increased Losses
25
Plant Action Plant Action Issue Review Local Investigation Action
Work Order Watch List Model Revision Cleared
26
Plant Action Issue Review
Plant personnel can quickly navigate to open items through Concerns Viewer by selecting status. Issue Review Allowing on-site personnel to view latest trends Local sensors can also be quickly displayed for further analysis
27
Plant Action Work Order
28
Confirmation and Closure
Feedback Loop is Essential
29
M&D Best Practices People Process Technology
30
People Having the right team Establish Relationships
Collaborative Relationship Plant Buy-in Clear Communication Prioritized Notification
31
Building a Streamlined Process
Invest Time Upfront Repair and Install Appropriate Instrumentation Establish Baselines Feedback Loop Issue Progression Item Closeout Quantifying Benefits Value Added Avoided Costs Give Credits Where Credits Due
32
Technology Having the Right Tools Data Availability
Automated System – Have the System Work for You APR Predictor EPReporter Performance Package Analysis and Diagnostics Achieving Top Performance
33
Practical Experience & Lessons Learned Establishing a Centralized M&D Function
Questions?
34
Practical Experience & Lessons Learned Establishing a Centralized M&D Function
Jon Pastuszynski Lead Engineer, M&D Center GP Strategies
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.