Presentation is loading. Please wait.

Presentation is loading. Please wait.

Presented by Jon Pastuszynski, Lead M&D Engineer

Similar presentations


Presentation on theme: "Presented by Jon Pastuszynski, Lead M&D Engineer"— Presentation transcript:

1 Presented by Jon Pastuszynski, Lead M&D Engineer
Practical Experience & Lessons Learned Establishing a Centralized M&D Function Presented by Jon Pastuszynski, Lead M&D Engineer

2 Agenda Introductions Overview & Basic Tools
Industry Drivers for Centralized M&D Services M&D Approaches – Centralized / Distributed / Hosted / Local M&D Structure, Processes and Capabilities Lessons Learned Successes Questions / Discussion / Demonstration

3 THERMODYNAMIC MODELING
Monitoring and Diagnostics Support Services “Focus on the Customer” / Common Platform / Standardization THERMODYNAMIC MODELING MACHINERY DYNAMICS ANOMALY DETECTION Electronic Logs Automated Alerts / Notices / Reports Reports Diagnostic Guides Trending

4 Advanced Patter Recognition
Asset Sensors History APR Model Power Output Reactive Load Exhaust Temp IGV Position Inlet DP Bearing Temp Bearing Vibration Wheel Space Temps Etc.

5 APR Advantages and Differentiators
Flexibility of Application, Utilization, and Interface Functionally Integrated M&D Solution Expansion of Existing Platform Intuitive Tools for Managing Assets Flexible Expected APR Value Measures EtaPRO™ APR EtaPRO™ VirtualPlant™ EtaPRO Predictor™ Fewer False Positives

6 Need for Flexibility – IT Infrastructure

7 Thick Client Access

8 Web Client Access

9 Mobile Access

10 Industry Drivers for M&D Support
Portfolio Management Technology Diversity Changing Markets Regulator Compliance NERC, EPA, OSHA, SEC Reliability Run Profiles / Cycling Access to SMEs People Aging Workforce / Retirements Workforce Reductions Training, Qualification & Retention

11 M&D Structure – Roles and Responsibilities
M&D STAFF Staff Engineers Daily Monitoring Activities Issue Tracking Report Development MDC Manager Day to Day Operations Issue Review Subject Matter Experts Advanced Troubleshooting Performance Evaluations PLANT PERSONNEL Plant Liaison Coordinate Communications Information Exchange On-site Inspections Ops / Engineers Attend M&D Calls Provide Feedback / Plan of Action I&C / Maintenance Provide Ground Level Input Take Action

12 M&D Capabilities & Processes
Program Process GP Strategies collaborates with clients to formalize acceptable communication, reporting and documentation protocols.

13 M&D Capabilities & Processes
Detection and Logging by EtaPRO APR APR Generates Concerns Viewable through APR User Interface Concerns are generated through APR

14 M&D Capabilities & Processes
M&D Action Preliminary Analysis Senior Review Event Capture and Management Notification and Consultation

15 M&D Action Preliminary Analysis Senior Review
Centralized Tag Location and Expected Values Quick Access to P&IDs and Equipment Specs Equipment Maintenance History Senior Review Issue Confirmation Criticality Cycle Performance

16 M&D Action Event Capture and Management Notification and Consultation
Logging Procedure Internal Tracking System Status Updates Notification and Consultation Notification Weekly/Monthly Reports Routine M&D Projects Calls with Plant Issue Tracking System Internal Event Log

17 M&D Action Notifications Detailed Description Pending Status

18 M&D Action Routine Reports

19 Equipment Performance Summary

20 Status Details

21 Equipment Performance Details

22 Monthly Heat Rate Report

23 Month-to-Month Heat Rate Analysis

24 M&D Action Heat Rate and Controllable Parameters Adjustments Made
(soot blowing, air/fuel, etc…) 50 $/hr Increased Losses

25 Plant Action Plant Action Issue Review Local Investigation Action
Work Order Watch List Model Revision Cleared

26 Plant Action Issue Review
Plant personnel can quickly navigate to open items through Concerns Viewer by selecting status. Issue Review Allowing on-site personnel to view latest trends Local sensors can also be quickly displayed for further analysis

27 Plant Action Work Order

28 Confirmation and Closure
Feedback Loop is Essential

29 M&D Best Practices People Process Technology

30 People Having the right team Establish Relationships
Collaborative Relationship Plant Buy-in Clear Communication Prioritized Notification

31 Building a Streamlined Process
Invest Time Upfront Repair and Install Appropriate Instrumentation Establish Baselines Feedback Loop Issue Progression Item Closeout Quantifying Benefits Value Added Avoided Costs Give Credits Where Credits Due

32 Technology Having the Right Tools Data Availability
Automated System – Have the System Work for You APR Predictor EPReporter Performance Package Analysis and Diagnostics Achieving Top Performance

33 Practical Experience & Lessons Learned Establishing a Centralized M&D Function
Questions?

34 Practical Experience & Lessons Learned Establishing a Centralized M&D Function
Jon Pastuszynski Lead Engineer, M&D Center GP Strategies


Download ppt "Presented by Jon Pastuszynski, Lead M&D Engineer"

Similar presentations


Ads by Google