1 Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1)
European Transparency Regulation (ETR / ERGEG) – Industry briefing (06-Nov-2014 session) – tcon Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1) ETR Industry briefing v0.1 (03-Nov-14)

2 ETR Industry briefing v0.1 (03-Nov-14)
Some ground rules Login to the “live meeting” session as “name (company)”. For example: Melanie (NG) Do not use the “live meeting” audio. Please dial in separately using the conference details in the appointment. When you have a query, use the dialog box to raise your hand. The presenter will stop at the appropriate moment and ask the person to speak. When speaking, please announce yourself “name (company)”. Sorry for this. Due to the expected large number of attendees, it is essential to follow this. ETR Industry briefing v0.1 (03-Nov-14) ETR Industry briefing v0.1 (03-Nov-14)

3 ETR Industry briefing v0.1 (03-Nov-14)
Agenda Testing update Update on key MP queries Looking ahead Any other business ETR Industry briefing v0.1 (03-Nov-14)

4 Testing update – MODIS testing internally
All system generated reports tested and number of defects raised. ETR Industry briefing v0.1 (03-Nov-14) 4

5 Testing update – Network Connectivity testing
Quorum, RWE, Centrica test request received – network connectivity to NG system successful. DRAX has successfully deposited (using sFTP) a sample report into NG. For other MPs please contact Isaac Wilks for network testing and for FTP credentials. ETR Industry briefing v0.1 (03-Nov-14) 5

6 Testing update (Processing of MP sample reports)
ENTSO-E Test platform access through: Can view Master config data currently loaded – note that Production unit level capacity is displayed Can view test reports that have been successfully processed Note: Need to navigate to United Kingdom Area (left hand side bar) and sub-category relating to National Grid ETR Industry briefing v0.1 (03-Nov-14) 6

7 Testing update (Processing of MP sample reports)
Sample files received NG XSD validation Elexon Upload ENTSO-E Upload A7.1a (Planned unavailability of Consumption units) A7.1b (Changes in actual availability of Consumption units) A15.1a (Planned unavailability of Generation units) 9 A15.1b (Changes in actual availability of Generation units) 7 A15.1c (Planned unavailability of Production units) A15.1d (Changes in actual availability of Production units) 4 REMIT 2 ETR Industry briefing v0.1 (03-Nov-14) 7

8 ETR Industry briefing v0.1 (03-Nov-14)
Testing update (Processing of MP sample reports) – info gathered so far A15.1: Mixed of success and failures at ENTSO-E end Failures due to: Incorrect EIC code for the Gen unit defined at ENTSO-E Start and end date & time of the main report does not fully encompass the time-series (A01) points covered Successes: Mixed time-series resolution in a single report is acceptable Use of P1D works ETR Industry briefing v0.1 (03-Nov-14) 8

9 Update on key MP queries so far
Stats gathered since inception (20-Oct-14) as at 06-Nov-14: 32 queries raised, 18 closed (was 11 and 5). Key queries and responses: Which of my EDT lines can I use to submit data down? For those with multiple EDT lines with NG, technically any line. However, we need to know the specific IP address you intend to use so that we can ensure data traffic can come through to MODIS. What is the Registered Capacity of my BMUs for the purpose of ETR reporting? If you need this, then please send request to NG ETR box . What is the status of the sample files that I sent you? Progressing with help from Elexon. ETR Industry briefing v0.1 (03-Nov-14)

10 ETR Industry briefing v0.1 (03-Nov-14)
Looking ahead NG has a dedicated tester importing MP sample reports and delivering of the Acks and Nacks NG is working closely with Elexon on system-to-system interface to allow faster turnaround on MP sample report feedback ETR Industry briefing v0.1 (03-Nov-14)

11 ETR Industry briefing v0.1 (03-Nov-14)
Looking ahead Continuing: Process MP sample reports onto ENTSOe platform via Elexon and provide feedback to MPs. TBC: Release of MODIS to allow external user access. w/c 01/12/14 (was 18/11): MODIS system rollout to Production. Note that Elexon system will not be available in the first 2 weeks of December 2014 to prepare for system go-live on 16/12/14. 16/12/14 to 04/01/15: Day 1 data load period to be organised in batches. Key risk(s) and issue(s): Risk: Unable to provide external users access to MODIS due to technical difficulties in integrating NG security layer with the MODIS application Mitigation: Alternative method being investigated. Initial testing expected Friday (31/10). Risk: Unable to provide feedback on MP sample reports Mitigation: Use of manual flow (via ) to NG Teat team. This is now possible since 17/10 when the pre-reg Master config file was successfully loaded in EMFIP (data used is aligned with LIO spreadsheet with a few exceptions). Risk: MODIS not ready in time for go-live Mitigation: Contingency plan being drawn up. Contingency solution requires MPs to submit reports via sFTP route. ETR Industry briefing v0.1 (03-Nov-14)

12 Updates on key actions:
1) Day 1 data preparation – When to submit the pre-reg Master config file relating to Company and BMUs? 23/10 Update: EMFIP indicated that pre-reg Master config data will be copied from current EMFIP Test platform. 2) Day 1 data preparation – When to submit the 3 years worth of data? 23/10 Update: Regulation seems to indicate “upto to 3 years of data”. Need to confirm this understanding amongst GB industry. Need to understand how much data the MP is planning to submit prior to go-live. 3) Confirm MODIS Design change on method of delivery of Ack/Nack messages to MPs. ETR Industry briefing v0.1 (03-Nov-14)

13 End Last slide