Presentation is loading. Please wait.

Presentation is loading. Please wait.

A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017

Similar presentations


Presentation on theme: "A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017"— Presentation transcript:

1 A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
Nuclotron: results of the 52nd, 53rd and 54th runs A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017

2 Contents Statistics of the Nuclotron operation Machine development
- dynamics optimization - diagnostics development Preparation for and Booster construction

3 Statistics of operation
Run #52 “technological” (650 h) RFQ fore-injector commissioning (first stage) Injection complex status, Anrdey Martynov SPI commissioning Test of polarimeters: after LU-20, at Internal target, at extracted beam Test of the Booster power supply prototypes at SC load Test of White Rabbit segment at Improvement of beam line current stability

4 Statistics of operation
Run # (1400 h) SPI optimization, polarimetry Spin physics experiments Test of and MPD elements Test of the Booster power supply prototypes with beam acceleration Stochastic cooling, diagnostics, adiabatic capture

5 Run #53 Routine operation of SPI and new fore-injector
Polarized deuteron acceleration: Intensity 25*108 8e8 Deuteron Spin Structure experiment, internal target

6 Statistics of operation
Run # (1010 h) Acceleration of polarized and unpolarized deuterons and protons Acceleration of carbon and lithium ions from laser source Maximum extracted beam energy 5.2 GeV/u (1.85 T)

7 Adiabatic capture RF Voltage vs time Capture efficiency ~ 70% 8e8 6e8

8 Adiabatic capture Routine operation during run #54
RF Voltage vs time Capture efficiency ~ 70% Routine operation during run #54 with injection at magnetic field plateau + adiabatic capture 8e8 6e8

9 Slow extraction Run #54, carbon ions, 5.2 GeV/u, VESS = 145 kV

10 Slow extraction Run #54 Evolution of the longitudinal Schottky at 1913 harmonics during 5 s of extraction Run #54 – RF knock- out using diagnostic kicker was tested

11 Q-meter RF and Pick-up signal synchronization
Single-bunch excitation and measurements 3D (Direct Diode Detection) Sensitivity down to 1e8 elementary charges Accuracy Q < Diagnostic kicker Report by E.Gorbachev, V.Volkov Beam diagnostics at the NICA 17:00

12 Diagnostics: bunch tomography
The particle distribution in the longitudinal phase plane E/E t/TRF

13 Diagnostics: bunch tomography
The particle distribution in the longitudinal phase plane a few ms after injection E

14 White rabbit: test at BM@N
First test: Run #52 bld. 201 ~ 1.5 km bld. 2 bld. 205 Report by E.Gorbachev, V.Slepnev NICA control system 16:30

15 Preparation for BM@N, beam lines
Nuclotron to beam line: 26 elements of magnetic optics: → 8 dipole magnets → 18 quadruple lenses Building 205 Nuclotron ~160 m

16 Improvement of the beam line current stability
Run #52 Prototype of the current control unit Long-range relative current stability of 50 КВ source is better than 10-3. Ripple at 300 Hz 0.5…1% (depending on output current). (Run #52)

17 New source at the beam line
Run #53 dipole magnet (СП 57) ИП LM Invertor (Moscow) 600 A, 180 V, ripple 10-4

18 The Booster power supply system
Consists of three powerful units: Main source 180 V, 12 kA Additional sources for quadrupole lenses 25 V, 400 A and 15 V, 300 A Three companies participate in the tender: LM Invertor (Moscow) EVPUas (Slovak Republic) Frako-term (Poland)

19 The Booster power supply
LM Invertor (Moscow) EVPUas (Slovak Republic) Frako-term (Poland) Prototypes are under the test during the Run #52 Operation on SC load for Quadrupole supply (instead of 37 TV JINR)

20 The Booster power supply
Three companies participate in the tender: LM Invertor (Moscow) EVPUas (Slovak Republic) Frako-term (Poland) Prototypes are under the test during the Run #52 Operation on SC load for Quadrupoles supply (instead of 37 TV JINR) Up to 600 A Dynamic behaviors Ripple level at the plateau

21 The Booster power supply
Three companies participate in the tender: LM Invertor (Moscow) EVPUas (Slovak Republic) Frako-term (Poland) Prototypes are under the test during the Run #52 Operation on SC load for Quadrupoles supply (instead of 37 TV JINR) IP600-80D (600 A)

22 The Booster power supply
Three companies participate in the tender: LM Invertor (Moscow) EVPUas (Slovak Republic) Frako-term (Poland) Prototypes are under the test during the Run #52 Operation on SC load for Quadrupoles supply (instestead 37 TV JINR) PS600 (600 A)

23 The Booster power supply
PS-1000 (1kA) Three companies participate in the tender: LM Invertor (Moscow) EVPUas (Slovak Republic) Frako-term (Poland) Prototypes are under the test during the Run #52 Operation on SC load for Quadrupoles supply (instead of 37 TV JINR)

24 The Booster power supply system
Prototypes were tested Run #52: Operation on SC load Run #53: Beam acceleration: LM Invertor EVPUas Frako-term unit is transferred to Facility for SC Magnets Assembling and Cryogenic Tests

25 Thank you for attention

26 Run #53 (longest at Nuclotron)
Time distribution Cooling, 7.3% Tuning, 8.7% Repairs, 4% Machine development NICA R&D (24%), Experiments Unexpected losses, 2.5% 77.6% Polarized, unpolarized deuterons, maximum energy of extracted beam 4.6 GeV/u