LHCOPN update Brookhaven, 4th of April 2017

Similar presentations


Presentation on theme: "LHCOPN update Brookhaven, 4th of April 2017"— Presentation transcript:

1 LHCOPN update Brookhaven, 4th of April 2017 edoardo.martelli@cern.ch

2 Latest news CA-TRIUMF - Will move from TRIUMF to SFU (Simon Fraser University) - Existing T1 will be dismantled by 2020 - Connectivity to SFU being set up now UK-T1-RAL - Activated IPv6 peerings - 3rd 10G link RAL-CERN being provisioned

3 Latest news IT-INFN-CNAF - new core network devices deployed
FR-CCIN2P3 - separated IPv4 and IPv6 traffic on single-stack VLANs

4 Latest news [Input from Tier1s in the audience]

5 LHCOPN map ES-PIC CA-TRIUMF US-T1-BNL TW-ASGC US-FNAL-CMS KR-KISTI
█ █ █ CA-TRIUMF AS36391 US-T1-BNL AS43 TW-ASGC AS24167 █ █ US-FNAL-CMS AS3152 KR-KISTI AS17579 RRC-KI-T1 AS59624 █ █ █ CH-CERN AS 513 █ █ █ █ UK-T1-RAL AS43475 █ █ █ █ RRC-JINR-T1 AS2875 NDGF AS39590 █ █ FR-CCIN2P3 AS789 █ █ █ █ NL-T1 AS1162, 1104 █ █ █ DE-KIT AS58069 █ █ █ █ IT-INFN-CNAF AS137 █ █ █ █ T0-T1 and T1-T1 traffic 10Gbps T1-T1 traffic only 20Gbps 40Gbps █ = Alice █ = Atlas █ = CMS █ = LHCb 100Gbps

6 Latest news CH-CERN - Wigner remote data-centre:
- added 3rd 100G link Geneva-Budapest - re-configured network to increase local capacity - Construction works for 2nd network hub almost completed. It will be used for business continuity. Installation of network devices will start in the summer - On-going tender for new datacentre routers - Evaluating construction of new datacentre on the French Site (Prevessin) for shared DAQ

7 CERN data centres setup

8 3rd 100G Geneva-Budapest link
T-Systems – GEANT#1 - GEANT#2

9 Experiments’ shared DAQ
Cloud resources T0-T1s network T1s-T2s network Internet Up to 40 Tbps DAQ lines = = = = = = = = = = = Prevessin DC Shared DAQ - Offline Geneva DC Computing-Storage Wigner DC Extra capacity CMS Not existing today Construction under evaluation ALICE ATLAS LHCb

10 LHC Schedule 2017 Q1-Q2 Here today

11 LHC Schedule 2017 Q3-Q4

12 Draft LHC Schedule 2018

13 Long term planning

14 HL-LHC plan LS2 (Long Shutdown #2)
Perform major maintenance and consolidation Increase injector reliability and lifetime to cover HL-LHC run until ~2035 Increase intensity in the injectors to match HL-LHC requirements Anticipate HL-LHC work

15 LHCOPN traffic – last year

16 CERN traffic – last 12 months
Average bandwidth increased of ~80% compared to previous year

17 Questions? edoardo.martelli@cern.ch