1 Announcements End of the class – course evaluation
Final project presentation Monday (5/8/17) at 10 a.m. Send me the ppt file before 9:45 a.m.

2 Objectives Learn about automatic control Course summary
PID and Control terminology Sequence of operation Control optimization Course summary

3 The Real World 50% of US buildings have control problems
90% tuning and optimization 10% faults 25% energy savings from correcting control problems Commissioning is critically important

4 Practical Details Measure what you want to control
Verify that sensors are working Integrate control system components Tune systems Measure performance Commission control systems

5 Modulating Control Systems
Example: Heat exchanger control Modulating (Analog) control air water Cooling coil x (set point temperature)

6 Modulating Control Systems
Used in larger systems Output can be anywhere in operating range Three main types Proportional PI PID Position (x) fluid Electric (pneumatic) motor Vfluid = f(x) linear or exponential function Volume flow rate

7 Proportional Controllers
x is controller output A is controller output with no error (often A=0) Kis proportional gain constant e = is error (offset)

8 Unstable system Stable system

9 Issues with P Controllers
Always have an offset But, require less tuning than other controllers Very appropriate for things that change slowly i.e. building internal temperature

10 Proportional + Integral (PI)
K/Ti is integral gain If controller is tuned properly, offset is reduced to zero Figure 2-18a

11 Issues with PI Controllers
Require more tuning than for P But, no offset

12 Proportional + Integral + Derivative (PID)
Improvement over PI because of faster response and less deviation from offset Increases rate of error correction as errors get larger But HVAC controlled devices are too slow responding Requires setting three different gains

13 Ref: Kreider and Rabl.Figure 12.5

14 The control in HVAC system – only PI
Proportional Integral value Set point Proportional affect the slope Set point Integral affect the shape after the first “bump”

15 HVAC Control Example 1: Economizer (fresh air volume flow rate control) Controlled device is damper - Damper for the air - Valve for the liquids fresh air damper mixing recirc. air T & RH sensors

16 Economizer Fresh air volume flow rate control % fresh air TOA (hOA)
enthalpy 100% Fresh (outdoor) air TOA (hOA) Minimum for ventilation damper mixing Recirc. air T & RH sensors

17 Economizer – cooling regime
How to control the fresh air volume flow rate? If TOA < Tset-point → Supply more fresh air than the minimum required The question is how much? Open the damper for the fresh air and compare the Troom with the Tset-point . Open till you get the Troom = Tset-point If you have 100% fresh air and your still need cooling use cooling coil. What are the priorities: - Control the dampers and then the cooling coils or - Control the valves of cooling coil and then the dampers ? Defend by SEQUENCE OF OERATION the set of operation which HVAC designer provides to the automatic control engineer % fresh air 100% Minimum for ventilation

18 Economizer – cooling regime
Example of SEQUENCE OF OERATIONS: If TOA < Tset-point open the fresh air damper the maximum position Then, if Tindoor air < Tset-point start closing the cooling coil valve If cooling coil valve is closed and T indoor air < Tset-point start closing the damper till you get T indoor air = T set-point Other variations are possible

19 HVAC Control Example 2: Dew point control (Relative Humidity control)
fresh air damper filter cooling coil heating coil filter fan mixing T & RH sensors Heat gains Humidity generation We should supply air with lower humidity ratio (w) and lower temperature We either measure Dew Point directly or T & RH sensors substitute dew point sensor

20 Relative humidity control by cooling coil
Mixture Room Supply TDP Heating coil

21 Relative humidity control by cooling coil (CC)
Cooling coil is controlled by TDP set-point if TDP measured > TDP set-point → send the signal to open more the CC valve if TDP measured < TDP set-point → send the signal to close more the CC valve Heating coil is controlled by Tair set-point if Tair < Tair set-point → send the signal to open more the heating coil valve if Tair > Tair set-point → send the signal to close more the heating coil valve Control valves Fresh air mixing cooling coil heating coil Tair & TDP sensors

22 Sequence of operation (ECJ research facility)
Set Point (SP) Mixture 2 Mixture 3 Mixture 1 DBTSP DPTSP Control logic: Mixture in zone 1: IF (( TM<TSP) & (DPTM<DPTSP) ) heating and humidifying Heater control: IF (TSP>TSA) increase heating or IF (TSP<TSA) decrease heating Humidifier: IF (DPTSP>DPTSA) increase humidifying or IF (DPTSP<DPTSA) decrease humid. Mixture in zone 2: IF ((TM>TSP) & (DPTM<DPTSP) ) cooling and humidifying Cool. coil cont.: IF (TSP<TSA) increase cooling or IF (TSP>TSA) decrease cooling Humidifier: IF (DPTSP>DPTSA) increase humidifying or IF (DPTSP<DPTSA) decrease hum. Mixture in zone 3: IF ((DPTM>DPTSP) ) cooling/dehumidifying and reheatin Cool. coil cont.: IF (DPTSP>DPTSA) increase cooling or IF (DPTSP<DPTSA) decrease cooling

23 Other examples for HVAC:
Heat recovery Dual duct system

24 Other examples Thermal storage UTs CHP

25 Course Summary Course Objectives:
Learn about advanced building HVAC systems Obtain knowledge about district cooling and heating systems. Gain the skills and tools necessary to evaluate integration of sustainable energy production systems to a given building site. Study application of combined heat and power systems in a specific building or group of buildings. Conduct thermal, hydraulic and economic modeling of integrated building energy systems for planning and design. Course Topics:  Class intro and HVAC systems Building ventilation heat recovery systems Thermal (solar and waste heat) powered desiccant systems 4. Centralized (compressor and sorption based) cooling systems 5. Centralized heating systems 6. District heating and cooling distribution systems 7. Combined heat and power systems 8. Systems integration and control