Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sergio Andreozzi + ValerioVenturi

Similar presentations


Presentation on theme: "Sergio Andreozzi + ValerioVenturi"— Presentation transcript:

1 Sergio Andreozzi + ValerioVenturi
Site Report – CNAF Sergio Andreozzi + ValerioVenturi JRA1 IT/CZ Meeting Torino, 5 Nov 2004

2 Site Report Sergio Andreozzi

3 Information Models GLUE Schema V. 1.2 First draft published
13 Issues covered and documented in: There is a fresh interest in restarting phone calls and defining a face-to-face meeting Possibly around the table INFN-Grid, Globus, EGEE, LCG, Grid3 and UK eScience

4 ANY ACTION BEFORE THESE TALKS???
Information Models All-Hands – Padova Tue 16 Nov :00->10:30 Information System (chaired by Steve Fisher) how and what information is published (hands-on), information for WMS, information for DM, service discovery Wed 17 Nov :00->10:30  DM & WMS interaction (chaired by Peter Kunszt)    Information System: Relationships of WM and DM services (15')  In this talk all the information system parameters that are necessary to actually perform the interaction between the DM and WM systems are revisited and exposed - to be eyed very cautiously by the audience ANY ACTION BEFORE THESE TALKS???

5 Matchmaking with CE/NE/SE
Obtained Condor gang-matchmaking extension code Plan to make some test using the info about network connectivity as available in the INFN-Grid testbed Currently 4 sites (Bari, Bologna/CNAF, Napoli, Padova), full-mesh To be reported at Dec JRA1 IT/CZ meeting

6 Site Report Valerio

7 VOMS Minor changes to EGEE cvs. VOMS on SL at CNAF.
Support to VOMS on SL at NIKHEF (Oscar Koeroo) and UiB (Patrick Guio). (results in some fixes to error logging at startup, installation and startup scripts and installation docs.) Fixes to Attribute Certificate encoding. (an error in encoding of validity fixed, some discussions are undergoing with JRA3 on other minor changes) Bug fixed in voms-proxy-info (a bug in the retreival of AC from certificate in the chain was fixed)

8 New release plan agreed with Erwin Laure
PM7 port to SL running in 3 sites (CNAF, NIKHEF, UiB) DONE PM8 AC format fixes and multy DN support PM9 documentation egeefied PM10 unit testing


Download ppt "Sergio Andreozzi + ValerioVenturi"

Similar presentations


Ads by Google