Important Reminder from Yesterday
Infrastructure requirements for ODINAFRICA installations
2
Infrastructure needed includes
A weather proof tide gauge hut for electronics 24 hour security Electricity Tools for installation (I have a list) A mounting arm for the radar gauge Mountings for the pressure sensors (one below low tide and one at approximately MSL) A pole for antennas A simple stilling well for calibration checks
3
Infrastructure needed
Note that technical details will be discussed by Peter Foden and Ruth Farre later in the week with everyone Discussed Wednesday with Mauritania, Cameroon, Congo, Ghana in detail.
5
As used at Pemba
6
Drawings for several types of arms are on PSMSL web site – see me if questions
There are weeks to go before installations in the first 4 ODINAFRICA stations. These infrastructure things must be ready!