Download presentation
Presentation is loading. Please wait.
Published byShawn Wade Modified over 6 years ago
1
DMG internal tools currently in use and plans to ingest requirements to ICT deliverables
E. Villard
2
Observing AoD interface
3
QA0 apo05/dmg02 scripts Metadata checker
TrackEONR.py Special cases (TP OFF, polarization) Metadata checker Plots? Fractional execution calculator
4
Metadata fixing Tsys regeneration SACM-211
5
Manual QA2 Script generator QA2 report generator
Only procedure to analyse ampcal QA2 report generator Antenna position offsets Flux value of calibrators Jy/K conversion factors CheckRMS
6
Pipeline PL checker Launch scripts
Fixes PPR edits flagtemplate SACM’s interface, to keep track of PL executions and enter flags (+ database) Script to extract QA scores Script to clean up PL directories
7
Archiving Script to add MOUS uid to folder/file names
8
Cal survey / source catalog
Launch script Script to extract flux values from weblog, format them and ingest them
9
Project tracking EPT Daily reports SACMs DRMs Pipeline working group
P2g iSOPT Upper management Daily reports QA0 pending_other and unset QSOs needing measurement DMG daily report
10
Summary Long-term replacement identified in most cases
Some already transferred, some in progress, some requested Areas that will need work QA0 of non-standard modes PL launch environment Reporting (huge work, across entire workflow)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.