1 LIU Consolidation project (INDICO 665320) E. Blanco BE/ICS
28/09/17 Industrial Controls

2 Industrial controls activities
E. Blanco, BE/ICS 28/09/17 Identified projects: PLAN: : POPS-B - New project PLAN: : LIU-SPS RF power upgrade BAF3 PLAN: 11054: GCS LINAC4 PLC and supervision code consolidation and upgrade

3 PLAN 10697 : POPS-B - New project
E. Blanco, BE/ICS 28/09/17 Project (EDMS ) New main power system for the supply of the Main ring Dipole and Quadrupole magnets. It will need a complete industrial control system. (The current PSB Main Power Supply is not suited to provide the voltage and current profiles required by the increased extraction energy from 1.4 GeV to 2 GeV) It will be based on CERN UNICOS framework and SIEMENS CPU S In terms of additional functionality that is required by the UNICOS framework, it had been summarized in the document sent to BE-ICS on 13th of June 2017. Project development by TE-EPC* BE-ICS contribution Specific development to be done for the framework adaptation. Under study Not critical for the success of the project. Dates LS2 * Communication by M. Dudek

4 PLAN: 10835 : LIU-SPS RF power upgrade BAF3
E. Blanco, BE/ICS 28/09/17 Project Associated by EN-CV to the ventilation renovation for the BAF3. Process responsibility: EN-CV* BE-ICS contribution Process control project for the ventilation of the BAF3. Already developed and sent to EN-CV Dates To be commissioned in November 2017 * Communication by R. Barillere

5 PLAN: 11054: GCS LINAC4 PLC and supervision code consolidation and upgrade
E. Blanco, BE/ICS 28/09/17 Project Linac4 hydrogen source. (Hydrogen Gas Delivery System for the LINAC 4 Ion Source) Consolidation of control logic. Still not specified. Upgrades of SCADA and UNICOS components. Nothing major (except maybe a check on risk analysis) Process responsibility: EP-DT (Gas team)* BE-ICS contribution Process control project Control components upgrade Dates LS2 (TBD) *(Communication by R. Guida)